Browse
Search
Agenda - 02-19-2008-4j1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:47:06 AM
Creation date
8/28/2008 9:43:09 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j1
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
environmental hazards, and make such changes in the Drawings and/or Specifications as <br />they may find necessary to abate, remediate, isolate or handle the environmental hazards. <br />Any increase or decrease in the Contract Price or the Contract Time resulting from such <br />changes shall be adjusted in the manner provided herein for adjustments as to extra and/or <br />additional Work and changes. It is agreed that the Contractor shall have no liability under <br />this Agreement for any environmental hazards existing at, on or in the Project site prior to <br />the date that Work commences under this Agreement unless the Contractor or its <br />Subcontractors, agents or employees, acting alone or in concert with others, by their own <br />negligence or misconduct, release or expose the Owner or third parties to the <br />environmental hazards. <br />The provisions of this paragraph 5.4 shall survive the termination or cancellation or <br />completion of this Agreement. <br />ARTICLE 6. OTHER RECORD DOCUMENTS AND SUBMITTALS <br />6.1 The CMAR shall furnish to the Contractor the number of copies of Drawings and <br />Specifications stated in the Supplementary Conditions. Additional copies of Drawings and <br />Specifications may be obtained at the cost of reproduction and handling. <br />6.2 The Contractor shall submit to the CMAR for forwarding to the Designer all Submittals <br />required by the Contract Documents. The Contractor shall submit four (4) reproducible <br />prints of all shop drawings plus the number of copies sufficient for its requirements. The <br />Contractor shall submit samples in quantities required by the Contract Documents. The <br />Contractor shall submit product data in five (5) copies, plus the number of copies sufficient <br />for the Contractors requirements. All shop drawings shall be reviewed by the Contractor <br />and shall bear the Contractor's stamp of approval before being forwarded to the CMAR and <br />the Designer. Submittals shall be submitted in such time as to cause no delay to the Work <br />or any part thereof and in accordance with the Contractor's Construction Schedule and <br />Submittal Register. The CMAR shall review and process the submittal with reasonable <br />promptness, noting desired corrections, if any. The CMAR shall retain three (3) copies of <br />the submittal and shall return the balance of the reviewed submittal to the Contractor for <br />action. The Contractor shall furnish any corrected submittal to the CMAR for forwarding to <br />the Designer. The CMAR shall retain three (3) copies of the corrected submittal for the <br />records of the CMAR and the Designer, and will return the balance of the reviewed <br />submittal to the Contractor. <br />Subject to paragraph 6.3 herein, no substitutions will be accepted after the bids have been <br />received. All substitutions prior to the receipt of bids shall be in accordance with the <br />Contract Documents. <br />The Contractor acknowledges that the processing of shop drawings and other submittals is <br />directly impacted by the clarity, completeness, and accuracy of said documents and that it <br />is the Contractor's responsibility to (i) review and coordinate each submittal with all other <br />related or affected Work and (ii) approve each submittal before submitting same to the <br />CMAR for approval. <br />6.3 No substitutions and no deviations from any requirement of the Contract Documents shall <br />be deemed allowed unless the Contractor has specifically informed the CMAR in writing of <br />such deviations at the time of submittal and the Designer and the Owner have given written <br />and specific approval to the substitutions or deviations. In proposing a deviation or <br />substitution, the Contractor warrants to the CMAR, notwithstanding any review, allowance <br />or approval by the Designer or the Owner, that the deviation or substitution is at least equal <br />to or better in quality and for the purpose intended, and that the Contractor shall not by <br />reason of any such review, allowance or approval be relieved from any obligation or <br />responsibility contained in the Contract Documents. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 16 of 42 JUNE 2007 EDITION
The URL can be used to link to this page
Your browser does not support the video tag.