Orange County NC Website
RB ENGINEERING, INC. <br />Page 3 <br />Schedule <br />ENGINEERING PROPOSAL 5 <br />January 25, 2008 <br />The anticipated time required in preparing both of the barn repair plans is approximately 3 to <br />4 months from the time in which we receive formal authorization (NTP) from you to proceed. <br />Results <br />As stated previously in this proposal, the primary purpose of our involvement will be to <br />determine structurally appropriate repairs to address existing structural issues. This proposal <br />has been written as a designibid project with RB Engineering, Inc. primarily handling the. <br />inspection/design aspect of the project and the building owner primarily handling the <br />bid/construction aspect of the project. At the completion of our design work, we will provide <br />you with an engineered set of construction documents, which qualified repair contractors . <br />may competitively bid upon. <br />Thank you again for the opportunity to submit this proposal. We look forward to working <br />with you on this assignment. Should you have any questions or concerns regarding this <br />proposal, please feel free to contact me at any time. <br />Respectfully submitted, <br />Ron Bittler, PE <br />RB Engineering, Inc. <br />Owner/President