Browse
Search
Agenda - 12-01-2014 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 12-01-2014 - Regular Mtg.
>
Agenda - 12-01-2014 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:38:34 PM
Creation date
11/26/2014 8:44:25 AM
Metadata
Fields
Template:
BOCC
Date
12/1/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
2015-113 Planning - Amendment to Interlocal Agreement between OC-City of Durham, Construction-Operation of Water-Sewer Facilities in the Eno ED Zone
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 12-01-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />FIRST AMENDMENT TO THE INTERLOCAL AGREEMENT <br />BETWEEN ORANGE COUNTY AND THE CITY OF DURHAM <br />FOR CONSTRUCTION AND OPERATION OF WATER AND SEWER FACILITIES <br />IN THE ENO ECONOMIC DEVELOPMENT ZONE OF ORANGE COUNTY <br />The City of Durham, a North Carolina municipal corporation ( "Durham ") and Orange <br />County, a North Carolina political subdivision ( "Orange ") entered into an "Interlocal Agreement <br />Between Orange County and the City of Durham for Construction and Operation of Water and <br />Sewer Facilities in the Eno Economic Development Zone of Orange County" ( "Original <br />Agreement ") on January 20, 2012. As a result of the November 2013 Draft Master Plan Report <br />prepared by CDM Smith, Durham and Orange would like to amend the Original Agreement <br />through this First Amendment to allow for additional time to study alternative design options. <br />Through this First Amendment the Original Agreement is only modified as indicated below and <br />the remaining portions of the Original Agreement shall remain in full force and effect. This First <br />Amendment is dated, made, and entered into as of the day of , 2015. <br />Paragraph 12 of the Original Agreement is modified as follows: <br />12. Duration. This agreement shall be perpetual, unless terminated earlier by mutual <br />agreement. Nevertheless, this contract shall terminate if construction of the infrastructure <br />has not begun by January 31, 2017. On such termination, all obligations that are still <br />executory on both sides are discharged but any right based on prior breach or <br />performance survives. The governing body of each party hereto has determined the <br />duration provided in this paragraph to be reasonable. <br />This amendment is made pursuant to Paragraph 14 of the Original Agreement. <br />This instrument has been pre- audited in the manner required by the Local Government Budget <br />and Fiscal Control Act. <br />Durham Finance Director <br />Orange Financial Services Director <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.