Browse
Search
Agenda - 12-01-2014 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 12-01-2014 - Regular Mtg.
>
Agenda - 12-01-2014 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:38:34 PM
Creation date
11/26/2014 8:44:25 AM
Metadata
Fields
Template:
BOCC
Date
12/1/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
2015-113 Planning - Amendment to Interlocal Agreement between OC-City of Durham, Construction-Operation of Water-Sewer Facilities in the Eno ED Zone
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 12-01-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eno EDID Conveyance System to <br />Durham Sewer System <br />------ <br />' <br />~` <br />- mtrvcGmn Comt — HKghNastmmater F| mv Scenario <br />Gravity Sewer - 8-inch DIP <br />Lf <br />6,669 <br />$ 358,00O <br />Jack & Bore <br />Lf <br />120 2 <br />$78,000 <br />Gravity Sewer - 12-inch DIP <br />Lf <br />5,822 <br />$ 420,000' <br />Gravity Sewer Manhole 3 <br />Ea <br />45 <br />$270,000 <br />Pump Station 4 <br />MGD <br />1.2 <br />$540,000 <br />12-inch Force Main 4 <br />Lf <br />7,000 <br />$378,000 <br />12-inch Jack & Bore <br />Lf <br />160 5 <br />$104,000 <br />18-inch Jack & Bore <br />Lf <br />100 <br />$125,000 <br />Gravity Sewer Manhole 3 <br />Ea <br />38 <br />$228,000 <br />Traffic Contro17 <br />Lf <br />8,000 <br />$180,000 <br />Pavement Replacement <br />F SY <br />1,000 <br />$42,000 <br />Subtotal <br />$3,943,000 <br />5% Mobilization/Demobilization <br />$200,000 <br />Subtotal <br />$4,140,000 <br />10% Contractor OH&P <br />$414,000 <br />Subtotal <br />$4,550,000 <br />25% Contingency <br />$1,140,000 <br />Subtotal <br />$5,690,000 <br />20% Engineering, Permitting, and Administration <br />t $ 1,140,000 <br />TOTAL $6�30,OUU <br />Notes: <br />1) Cost reflects various depths of cover. Not shown in table for clarity, <br />Z) Jack & Bore costs reflect two (Z)GO4tbores. See Note 10. <br />3> Gravity sewer manhole spacing of3OBfeet. <br />o) Pump station sized for 3O year flows. <br />s) Jack & Bore costs reflect one (z) 1OU-ft bore and one (z) Gd4tbore. See Note zO. <br />6) Cost assumes 1S-feetmfcover. <br />7} Traffic control required during installation of force main along Hwy 10. <br />i dase on � based High ri��ithapeukinQfactorof25 <br />D) snosmoA�vityoewerxyxte�w�ss�e flow � <br />9) Cost does not reflect pump replacement byzo35. <br />10) Jack & Bores were assumed for: <br />• 5O4t bore under Hwy 70 (Eno coD Gravity System) <br />• 60-ft bore under stream crossing near pump station (Eno EDD Gravity System & Conveyance System) <br />• 1OO-ft bore under Sa751 along force main route (Eno son Conveyance System) <br />= 1OU4t bore under railroad along force main route (Eno EmoConveyance System) <br />84 ��th <br />17 <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />. 1Z <br />- Jazza <br />
The URL can be used to link to this page
Your browser does not support the video tag.