Browse
Search
Agenda - 12-01-2014 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 12-01-2014 - Regular Mtg.
>
Agenda - 12-01-2014 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:38:34 PM
Creation date
11/26/2014 8:44:25 AM
Metadata
Fields
Template:
BOCC
Date
12/1/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
2015-113 Planning - Amendment to Interlocal Agreement between OC-City of Durham, Construction-Operation of Water-Sewer Facilities in the Eno ED Zone
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 12-01-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />Section I a introduction <br />Permit Agency Coordination <br />The purpose uf this task was to identify the potential permitting needs and coordinate with the <br />associated regulatory agencies, if needed, ou what the permit requirements would b6. The types of <br />permitting needs related to work such as stream channel crossings, wetland crossings, and North <br />Carolina Department uf Transportation (NCD0]) encroachment. <br />Cost Estimate <br />The purpose oftbim task was to develop conceptual opinions o[ probable cost for the proposed water <br />,and wastewater infrastructure within the Eno 0]D. <br />Master Plan Report <br />The purpose of this section was to document the evaluations and findings from the previous tasks into <br />a comprehensive master plan report that would guide the City and County moving forward. <br />���� ��� � <br />�.~� »������,� / ������� <br />The remainder of this report isorganized -into the following sections, with a brief description of each <br />sections purpose following the name: <br />= This section provides o <br />description of the methodology and assumptions by which the demand and flow projections <br />were developed. <br />� This section <br />provides a description of the existing water infrastructure within the Eno EDD followed by the <br />evaluation that was performed to determine the additional infrastructure required to provide <br />the backbone for the system. <br />= This section describes the <br />process by which the recommended wastewater collection system infrastructure within the Eno <br />EDD was developed. <br />� This section <br />describes the alternatives analysis dzotwms performed to determine where io the City's <br />wastewater system the wastewater 0uns8eueraLediotbeEunBDDsboubibodisobarged. <br />= This section provides u description of how the <br />costs were developed as well as a breakdown of the cost by each of the major infrastructure <br />� This section p a description of the environmental <br />impacts that are anticipated if the proposed i were constructed us well ayu list o[ <br />all permits that would be anticipated to be required priOr to initiating construction. <br />� This section provides a brief summary ofthe <br />fecommonded infrastructure and associated cost followed by the options for how the City and <br />County can advance the project forward. <br />mith 2-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.