Browse
Search
Agenda - 12-01-2014 - 6h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 12-01-2014 - Regular Mtg.
>
Agenda - 12-01-2014 - 6h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:39:57 PM
Creation date
11/26/2014 8:38:05 AM
Metadata
Fields
Template:
BOCC
Date
12/1/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6h
Document Relationships
2015-118 AMS - Muter Construction LLC for Cedar Grove Community Center Roof Replacement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 12-01-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. The Contractor shall supervise and direct the Work efficiently and with the Contractor's best <br />skill and attention. Except as specifically set forth in the Contract Documents the Contractor <br />shall be solely responsible for the means, methods, techniques, sequences and procedures of <br />construction, and for safety precautions and programs in connection with the Work. The <br />Contractor shall be responsible to see that the finished Work complies accurately with the <br />Contract Documents. <br />h. The Contractor shall appoint a competent Project Manager with general authority to manage <br />the Project for the Contractor. The Contractor shall also keep on the Project at all times during <br />the Work of the Contractor a competent Resident Superintendent and necessary assistants who <br />shall not be replaced without prior written approval by the Designer or by the Owner if a <br />Designer is not retained for the Project. <br />i. If, in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise <br />unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the <br />Contract Price if and when directed by the Designer. <br />The Contractor shall attend all progress conferences and all other meetings or conferences. <br />The Contractor shall be represented at these progress conferences by a representative having <br />the authority of the Project Manager and by such other representatives as the Designer may <br />direct. <br />k. Costs and expenses of providing samples for and assistance in any testing shall be borne by the <br />Contractor. Any Work in which untested materials are used without approval or written <br />permission of the Owner and /or Designer shall be removed and replaced at Contractor's <br />expense. <br />5. PAYMENT & TAXES <br />The Owner hereby agrees to pay to the Contractor for the faithful performance of this <br />Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not -to- <br />exceed four hundred forty five thousand six hundred sixty dollars Dollars ($445,660). Not <br />later than the fifth (5th) day of each calendar month the Contractor shall submit to the Owner's <br />Representative, generally the Designer if a Designer is retained on the Work, a Request for <br />Payment for work done during the previous calendar month. <br />(i) The Request for Payment shall be in form of a standardized invoice or AIA Document <br />G702 -703 appropriately addressed to Owner's Representative at 5th Wall Building <br />Diagnostics Consultants and shall show substantially the value of work done during the <br />previous calendar month. <br />(ii) The amount due for payment shall be ninety -five percent (95 %) of the value of work <br />completed since the last Request for Payment and this amount shall be paid by the <br />Owner on or before the last business day of the month. Owner shall retain five percent <br />(5 %) (the "Retainage "). <br />(1) Upon Owner's Representative's certification that fifty percent (50 %) of the <br />Work has been satisfactorily completed Retainage shall be reduced to two and <br />one half percent (2%2 %). <br />Revised 10/14 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.