Browse
Search
Agenda - 12-01-2014 - 6h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 12-01-2014 - Regular Mtg.
>
Agenda - 12-01-2014 - 6h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:39:57 PM
Creation date
11/26/2014 8:38:05 AM
Metadata
Fields
Template:
BOCC
Date
12/1/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6h
Document Relationships
2015-118 AMS - Muter Construction LLC for Cedar Grove Community Center Roof Replacement
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 12-01-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
View images
View plain text
K <br />[Departmental Use Only] <br />TITLE Cedar Grove Roof Replacement <br />FY 2015 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement "), made as of the 1 st day of <br />December, 2014, by and between Muter Construction LLC, (hereinafter called the "Contractor "), and Orange <br />County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br />"County," "Orange County," or "Owner "). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and /or field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br />c. Designer approved communications and /or field orders. <br />d. Request for Proposals and addenda thereto. <br />e. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to- Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />Construction Drawings prepared by 5 1 Wall Building Diagnostics Consultants (Sheet 1.01 <br />through 1.05 dated September, 2014) <br />b. Written specifications prepared by the Designer. <br />c. Bid number 367 -296 proposal dated November 13, 2014 which fully describes the work to be <br />performed, such work (hereinafter called the "Work "). <br />Revised 10/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).