Orange County NC Website
Office of the Orange County Sheriff <br />Lindy Pendergrass, Sheriff <br />toyptp °! ?l <br />P.O. Box 8181- <br />144 East Margaret Lane ! <br />Hillsborough, NC 27278 <br />d• po <br />Casc?February 6, 2008 <br /> <br />Mr. Chris Wood <br />N.C. Department of Health and Human Services <br />Division of Facility Services <br />Jail and Detention Section <br />P.O. Box 885 <br />Troy, NC 27828 <br />Dear Mr. Wood, <br />I have reviewed your recommendations and they have been addressed; <br />Written classification procedures. Inmate classification for safety is a primary duty of our supervisors <br />and is ongoing daily. <br />1) On the Friday January 18, 2008 on the date of your inspection we were holding in our jail 152 inmates. <br />We-were as stated 23 over our 129 of capacity. You also wrote that we should reduce Federal Inmate <br />population as soon as possible to prevent unnecessary overcrowding. In 1997 we received a 2 million <br />dollars from the US Marshal to build our annex. We also signed a contract to hold daily 75 federal <br />inmates. On this date we were 12 under our contracted number. <br />The other 89 "inmates' housed in the jail were state intiiates either being held-for trial; sentenced to the jail <br />or waiting to be sent to DOC. <br />2) The fan near E-block has been moved and placed back in storage. The fan had been used to cool the <br />area when the air-conditioning went out. <br />3) The desk in the area of K-block has been moved. The desk had been used to write reports. <br />4) Hallway leading to the annex has been addressed with the Fire Marshall. The Fire Marshall has no <br />problem with the storage lockers in the hallway being used to store inmates property. We are not to <br />increase or place any more lockers beyond those now in place. Our evacuation route for emergencies <br />is in the opposite direction down the stairwell to the outside of the jail. <br />5) Sanitation inspection will be conducted within 30 days. <br />6) Painting of the entire annex is being completed as of this week. <br />7) Cleaning of the vents by public works should be completed within 1 week.