Browse
Search
Minutes 10-14-2014 Late
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2014
>
Minutes 10-14-2014 Late
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2015 11:56:12 AM
Creation date
11/19/2014 8:22:02 AM
Metadata
Fields
Template:
BOCC
Date
10/14/2014
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 10-14-2014 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-14-2014 - Work Session - Late
Agenda - 10-14-2014 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-14-2014 - Work Session - Late
Agenda - 10-14-2014 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-14-2014 - Work Session - Late
Agenda - 10-14-2014 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-14-2014 - Work Session - Late
Agenda - 10-14-2014 - 4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-14-2014 - Work Session - Late
Agenda - 10-14-2014 - 5
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-14-2014 - Work Session - Late
Agenda - 10-14-2014 - 6
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-14-2014 - Work Session - Late
Agenda - 10-14-2014 - 7
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-14-2014 - Work Session - Late
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pushed out through the ESF-15 or public affairs. He said the EOP resides within emergency <br /> services and on their S drive. <br /> Bonnie Hammersley said the Strategic Communications Plan should include a <br /> reference to the EOP. She said this plan has been available for years but it has been updated <br /> and is more readily available due to technology. <br /> Commissioner Price asked about the interoperability with the towns. <br /> Jim Groves said the towns have been pulled in from the beginning, before this system <br /> was even proposed. He said Chapel Hill, Carrboro and OWASA have fully bought into the <br /> Everbridge system. <br /> Commissioner Price asked who pushes out information in an event where Chapel Hill <br /> gets a hold of it first. <br /> Jim Groves said it depends on the situation, and this would be up to the town. He said <br /> the relationship and the communication have been very good. <br /> Bonnie Hammersley said whenever the ECC is activated she will inform all of the Board <br /> of County Commissioners. She said if there is a disaster only in Chapel Hill, the ECC will be <br /> activated and everyone will know about it. <br /> Bonnie Hammersley said the GETS cards are important so that the Commissioners can <br /> contact her or Jim Groves in the event of an emergency to notify them of issues in their local <br /> neighborhoods. <br /> 6. Website Desiqn Presentation <br /> Carla Banks reviewed the following PowerPoint slides. <br /> WEB SITE REDESIGN <br /> Presented By: <br /> Public Affairs & Information Technologies <br /> Introduction <br /> In May of 2014, the contract with Revize was approved and the first of three payments was <br /> submitted to get the design process underway. Also, a Web site Design Committee was <br /> assembled to guide the design efforts. <br /> The committee is made up of representatives from the following County departments: <br /> • Library <br /> • Aging <br /> • Animal Services <br /> • Health Department <br /> • Clerk's Office <br /> • Economic Development <br /> • Environment, Agriculture, Parks & Recreation <br /> • Information Technologies <br /> • Public Affairs <br /> Project Action Items <br /> • In August, the Design Committee received the second of three initial design concepts <br /> • In September, the Web Masters were consulted for input on the current design concept <br /> (version 2 of 3) and their feedback was solicited in a survey. <br /> • The Web Masters shared the design concept with their respective department heads <br /> for additional feedback to aid in completing the survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.