Browse
Search
S Memorandum of Understanding Supporting Voluntary & Temporary Revisions to Eno River Flow Management Practices for the West Fork Eno Reservoir and Lake Orange
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2010 - 2019
>
2014
>
S Memorandum of Understanding Supporting Voluntary & Temporary Revisions to Eno River Flow Management Practices for the West Fork Eno Reservoir and Lake Orange
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2014 8:40:12 AM
Creation date
11/18/2014 8:37:48 AM
Metadata
Fields
Template:
BOCC
Date
10/21/2014
Meeting Type
Regular Meeting
Document Type
Others
Agenda Item
13-3
Document Relationships
Agenda - 10-21-2014-13 (3)
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 10-21-2014 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING SUPPORTING VOLUNTARY&TEMPORARY REVISIONS TO ENO <br /> RIVER FLOW MANAGEMENT PRACTICES FOR THE WEST FORK ENO RESERVOIR AND LAKE ORANGE <br /> The Town of Hillsborough and Orange County agree to modify our current practices for management of <br /> the Eno River flow through the Hillsborough USGS stream gauge. These modifications are made <br /> primarily in consideration of the concerns of property owners/residents along the shoreline of Lake <br /> Orange, Lake Orange Incorporated,and recreational users of Lake Orange,who desire Lake Orange to be <br /> maintained at a level no lower than 24 inches below full,to the extent possible. It is noted that the <br /> Town of Hillsborough is not required to take these steps; however,the town is is giving up a portion of <br /> its water capacity to be a good partner to Lake Orange stakeholders in good faith. <br /> Between the months of April and October each year that this agreement is active: <br /> • The Town of Hillsborough agrees to provide the required instream flow requirement at the <br /> Hillsborough Gauge that is currently required from Lake Orange(varies,based on the Lake <br /> Orange water level),as well as the water usage requirements of the Town of Hillsborough, <br /> Orange-Alamance Water System,and Piedmont Minerals through releases from the West Fork <br /> Eno Reservoir(WFER). <br /> • Orange County agrees to provide the required instream flow requirement at the Hillsborough <br /> Gauge that is currently required from the WFER(1.0 cubic feet per second)through releases <br /> from Lake Orange. <br /> The goal of these management modifications is to maintain Lake Orange water levels within 24 inches <br /> from full pool(615')during the months of April through October each year. This is the primary period <br /> for recreation within Lake Orange. Compliance with this agreement is contingent upon adequate <br /> seasonal water supplies available to fulfill the demands of the water users that are part of the Voluntary <br /> Capacity Use Agreement. <br /> This agreement shall have an initial term through December 2015. It is anticipated that the Town of <br /> Hillsborough will begin construction of Phase 2 of the West Fork Eno Reservoir in 2016(or shortly <br /> thereafter). During construction,this modification to the Eno River flow management will not be <br /> possible. Reinstatement of these management practices may be considered upon completion of <br /> construction of WFER Phase 2. <br /> If,at any time,for any reason,either the Town of Hillsborough or Orange County decides to withdraw <br /> from this agreement,the management practices set forth in the Voluntary Capacity Use Agreement <br /> (Table 1-Eno River Water Management Plan,current revision)shall be reinstated. The Voluntary <br /> Capacity Use Agreement remains the legal plan of record. <br /> TOWN OF HILLSBOROUGH ORANGE COUNTY <br /> W V .&f �� j-�5L <br /> Kenneth P.Keel,PE,Town Engineer Kevin Lindley,PE,Staff Engineer <br /> (Staff manager of WFER releases) (Staff manager of Lake Orange releases) <br /> Date: t/ q Date: ( � <br />
The URL can be used to link to this page
Your browser does not support the video tag.