Browse
Search
Agenda - 11-18-2014 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 11-18-2014 - Regular Mtg.
>
Agenda - 11-18-2014 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:24:53 PM
Creation date
11/17/2014 10:09:34 AM
Metadata
Fields
Template:
BOCC
Date
11/18/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 11-18-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />1 Chair Jacobs said this situation was what raised the issue to the County <br />2 Commissioners. <br />3 Commissioner Price said there are other locations with regulations based on water <br />4 availability. <br />5 Chair Jacobs said this is one of the reasons that public hearings are valuable to the <br />6 Board, as it allows them to hear public concerns, and it raises issues that might not have been <br />7 heard otherwise. He said this is not just a scientific investigation; but there was some hope or <br />8 intention that this would result in an impact on where things are sited. <br />9 Commissioner Price questioned whether they have a right to regulate this. <br />10 Commissioner Pelissier said when she was on the Commissioner for the Environment <br />11 she was told that there was another County that has its zoning areas designated based on re- <br />12 charge rates. <br />13 Dave Stancil said Guilford County is the only other county where this level of detail has <br />14 been done. <br />15 Chair Jacobs said there was some discussion of this when the rural buffer was formed. <br />16 He said it would be nice to have a narrative to go with this and to work toward making this a <br />17 utilitarian effort. <br />18 Dave Stancil said staff can provide some context and work with Craig Benedict to show <br />19 how the protocol relates to the questions that have been asked. <br />20 Tom Davis said data collection is on- going, and it would be good to install an automatic <br />21 rain gauge to get the precipitation information. He said he has prepared annual reports, and <br />22 these are available on -line. <br />23 Tom Davis said there has been a lot of media coverage about hydrilla in the Eno River. <br />24 He said a task force has been formed to work on this issue, and they are working toward <br />25 developing a two year management study to address this issue. He anticipates coming to the <br />26 Board in the future to request funding for this. <br />27 <br />28 4. Jordan Lake Allocation Application <br />29 Kevin Lindley said this process has been going on for several years in developing an <br />30 allocation request. He said there is an existing one million gallon per day allocation with Jordan <br />31 Lake and the County has been paying a maintenance amount of $2,200 per year for this <br />32 allocation. He said this is a level two allocation, which means it is not planned to be used in the <br />33 near future. He reviewed the following background information from the abstract: <br />34 <br />35 BACKGROUND: Orange County is in the process of applying for an increase in its existing <br />36 Jordan Lake Allocation. The County currently holds an allocation of 1.0 million gallons per day <br />37 (MGD) and is applying for an additional 0.5 MGD. This allocation is meant to provide a secure <br />38 water supply through the year 2045 for portions of the County designated for economic growth. <br />39 The County does not have a public water utility and there are no plans to develop a water utility <br />40 service. Rather, the County will rely upon municipalities located adjacent to the economic <br />41 development regions to provide the finished water. The Jordan Lake Allocation will be used to <br />42 supplement the water supply of these municipalities, as needed. <br />43 There are three areas of economic interest (see Attachment A) which staff used to develop <br />44 estimates of future demand, the Buckhorn- Mebane area (western Orange), Hillsborough area <br />45 (central Orange) and Eno area (eastern Orange). These areas already have or will have water <br />46 supplied by the City of Mebane, Town of Hillsborough, and City of Durham, respectively. The <br />47 water from Jordan Lake can be accessed via Durham's interconnect with the Town of Cary. The <br />48 water would then be used to augment the Durham supply or sent to Hillsborough via the <br />49 interconnect shared between Durham and Hillsborough. <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.