Browse
Search
Agenda - 06-05-1995 - IX-C
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 06-05-95
>
Agenda - 06-05-1995 - IX-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2014 4:36:17 PM
Creation date
11/13/2014 4:35:54 PM
Metadata
Fields
Template:
BOCC
Date
6/5/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-C
Document Relationships
Minutes - 19950605
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
RES-1995-029 Resolution of Approval of Eno Woods Subdivision Preliminary Plan - Agenda 6-5-1995 - IX-C
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> B. Roads and Access <br /> 1. Eno Woods Trail, Laurel Creek Way, Wild Harvest Court, Few's Ford Lane, <br /> Trading Path shall be constructed to standards of the North Carolina <br /> Department of Transportation, within a 50-foot right-of-way, and the <br /> construction shall be inspected and approved by NCDOT. <br /> OR <br /> A letter of credit, escrow agreement, or bond shall be submitted to secure <br /> construction of Eno Woods Trail, Laurel Creek Way, Wild Harvest Court, <br /> Few's Ford Lane, Trading Path to the standards of the North Carolina <br /> Department of Transportation. An estimate of the construction cost must be <br /> prepared by a certified/licensed engineer or grading contractor and submitted <br /> to the Planning and Inspections Department. The financial guarantee must <br /> reflect 110% of that estimate and be issued by an accredited financial <br /> institution licensed to do business in North Carolina. <br /> The document describing development restrictions to be recorded with the <br /> Final Plat shall state that the financial guarantee will not be released until the <br /> road construction has been inspected and approved by NCDOT. <br /> 2. An erosion control plan for construction of the roads shall be submitted by the <br /> applicant for review and approval by the Orange County Erosion Control <br /> Division. <br /> 3. The intent for future extension of the right-of-way on lot 19 Road shall be <br /> indicated on the Final Plat by the words "Subject to Future Extension". <br /> 4. A 10' by 70' sight triangle shall be shown at all road intersections. <br /> 5. Lots 25-28 shall access onto Few's Ford Land and lots 20-24 shall access onto <br /> Eno Woods Trail. All lots shall access onto the new subdivision roads. This <br /> restriction shall be stated in a document describing development restrictions <br /> and requirements to be prepared by Planning Staff and recorded concurrently <br /> with the Final Plat. <br /> 6. Approved street name signs shall be erected at the intersection of streets as <br /> required in Section IV-13-3-c-12 of the Orange County Subdivision <br /> Regulations. Evidence shall be submitted by the applicant that the sign is in <br /> place or a copy of the receipt for purchase of the sign shall be submitted to the <br /> Planning Department. <br /> 7. Dedicate a 50-foot public right-of-way along the southern lot line of lot 19 <br /> extending from Laurel Creek Way to the western boundary line. Provide a <br /> deed to Orange County for the stub-out. <br /> C. Land Use Buffers and Landscaping <br />
The URL can be used to link to this page
Your browser does not support the video tag.