Orange County NC Website
1 28 <br /> WE, the undersigned, although unable to attend the public <br /> hearing on May 25, 1995, urge the Orange County <br /> Commissioners to: <br /> (1) increase the impact fee on new residential construction <br /> to $1, 500 immediately; <br /> (2) carry out a survey this summer to establish <br /> representative student-generation rates for new residences; <br /> and <br /> (3 ) establish an appropriate sliding scale for impact fees <br /> as soon as possible thereafter, to incoporate local school <br /> construction standards and newly established student- <br /> generation rates . <br /> AS PHONE <br /> C <br /> (z0� */ 1367-77-37 <br /> sc�u2 AL, 4 <br /> 4 L- Lis 2 <br /> 9�9 glZ <br /> h r C _f a8 <br /> N/ <br /> �/ ;y CA-- J33 <br />