Browse
Search
Agenda - 05-16-1995 - VII-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 05-16-95 Late
>
Agenda - 05-16-1995 - VII-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 12:23:08 PM
Creation date
11/6/2014 12:23:06 PM
Metadata
Fields
Template:
BOCC
Date
5/16/1995
Meeting Type
Special Meeting
Document Type
Agenda
Agenda Item
VII-A
Document Relationships
Minutes - 19950516
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���'o✓� �� Eve ��/ l 12-21-93 <br /> 4 , <br /> UTILITY EXTENSION FUND PROCEDURES <br /> Staff will review initial requests. <br /> Any recommendations for County participation should conform <br /> with existing Eater and Sewer Policy requiring maximum 5- <br /> year payback in increased property taxes. Five years is a <br /> maximum and staff is encouraged to limit County <br /> participation in any individual project so that more <br /> projects can be considered. A project must also be <br /> evaluated based on Goal 4, Section of the Policy that <br /> states: <br /> 1. The project must be assured of having the proper zoning <br /> at the proposed site; and <br /> 2. The project must improve job opportunities available to <br /> Orange County citizens, especially for women and <br /> minorities; and <br /> 3 . The project must provide jobs with wage scales in <br /> compliance with Orange County standards adopted from <br /> time-to-time; and <br /> 4 . The project must have a positive fiscal impact upon <br /> Orange County government (The cost of services to be <br /> provided by Orange County to the project must be less <br /> than the local taxes and other revenues paid to the <br /> County generated by the project. ) . A fiscal impact <br /> analysis shall be prepared by the applicant and verified <br /> by Orange county and using a model provided by Orange <br /> County. <br /> Once a request is made, the staff will present it to the EDC <br /> for a recommendation and then to the Board of County <br /> Commissioners for a decision to proceed or not. <br /> Reimbursements should be considered for construction and <br /> engineering costs. _ <br /> County funds should be used as repayment only after projects <br /> are finished and the County Engineer has insured substantial <br /> completion and compliance to County standards. <br /> Staff should consider need, job creation, wage levels, long- <br /> term repayment, long-term stability and any other criteria <br /> established by the Board of County Commissioners before <br /> making recommendations. <br /> The staff shall provide an annual review of projects funded <br /> and their status and impact to the EDC Board. <br /> i <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.