Browse
Search
Agenda - 05-16-1995 - V-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 05-16-95 Late
>
Agenda - 05-16-1995 - V-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 12:20:57 PM
Creation date
11/6/2014 12:19:42 PM
Metadata
Fields
Template:
BOCC
Document Relationships
Minutes - 19950516
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
RES-1995-021 Resolution Supporting the Preliminary Recommendations for a Regional Transit Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g <br /> TTA - <br /> Triangle Fixed Guideway Study <br /> Triangle Transit Authority Spring 1995 <br /> What Happens Next? Preliminary Recommendations: <br /> Now that the TTA Board of Trustees A Regional Transit Plan for the Triangle <br /> has approved the Preliminary Rec- Based on its two year study of the Triangle Region's goals and needs,alternatives for <br /> land use and transportation,and public input throughout the planning process,the <br /> ommendations for a Regional Tram- TTA has developed a preliminary Regional Transit Plan that includes the following <br /> recommendations: <br /> sit Plan,local governments and TTA <br /> Phase I Recommendations: 1995-2002 <br /> will hold joint public meetings in ► Operate regional rail in the NC Railroad(NCRR)and CSX rail corridors connecting <br /> nI to.review the recommenda- Durham,Research Triangle Park(RTP),Raleigh-Durham Airport(RDU),Morrisville, <br /> -:_ Cary, Raleigh and North Raleigh. <br /> (ions and gather and responses before the plan is community input 1 Plan and develop fixed guideway transit for the U.S. 15-501 corridor between <br /> po' " Chapel Hill and Durham. <br /> 1 Study a rail extension to the Airport and the proposed mid-region hub. <br /> finally approved and implemented. ► Use shuttle or feeder bus systems to connect people beyond walking distance to <br /> Along with this local review and rail stations; coordinate existing bus services to serve the rail stations. <br /> approval process,TTA will negotiate ► Provide direct express and increased local bus service between Chapel Hill and <br /> the rail stations at Duke and RTP;and between North Raleigh and the RTP stations. <br /> operating agreements with the rail- 1 Extend TTA Regional Bus Service to Apex,Garner,Fuquay-Varina,Hillsborough, <br /> roads,complete environmental stud- Holly Springs,Knightdale,North Durham, North Raleigh,Wake Forest,Wendell, <br /> and Zebulon. <br /> ies,and'determine final capital and ► Preserve rail corridors throughout the region in anticipation of long-term rail <br /> operating costs. expansions. <br /> 1 <br /> Consider high-occupancy vehicle(HOV)lanesfor expansion or new construction <br /> TTA will move ahead with the plan of highways. <br /> Phase 11 Recommendations:2003-2010 <br /> only if—at each stage of the plan- ► Construct and operate a fixedguideway system between Chapel Hill and Durham. <br /> ning—local communities support 1 Coordinate construction of an Airport connector with RDU's people mover. <br /> the plan,costs appear to be reason- ► Extend the North Raleigh line from Spring Forest Road to the Outer Loop. <br /> able,and funding is available. As ► Continue to study HOV facilities for new and expanded highways. <br /> Long-Term Recommendations:2020 <br /> in earlier phases of this project,your 1 Evaluate expansion of regional rail service to Apex, Garner, Fuquay-Varina, <br /> opinions on the Regional Transit Plan Hillsborough, Knightdale, North Durham, Wake Forest, Wendell and Zebulon. <br /> and howwell it meets the needs of the About this issuo... <br /> This issue of Mobility Choices resents the want more information on the Regional <br /> Triangle Region are crucial in build- <br /> TTA's Preliminary Recommendations for a Transit Plan,please contact: <br /> ing consensus on development of a Regional Transit Plan. The articles describe Juanita Shearer-Swink,ASLA <br /> Phases I and II and the Long-term recom- Triangle Transit Authority <br /> fixed guideway transit system. At- mendations,outline the benefits of the plan, P.O. Box 13787,RTP,NC 27709 <br /> tend a public meeting near and provide answers to some of your ques- (919)406-1710/Fax:990-9127 <br /> P 9 youl tions. If you have comments,questions,or <br /> Spring 1995, Choices <br />
The URL can be used to link to this page
Your browser does not support the video tag.