Orange County NC Website
Estimated Facility Renovation Costs <br />Former Orange Enterprises Building <br />General Conditions <br />5u envision 17,000 <br />Dis osal 2,000 <br />Bld Permit 1 % 3,465 <br />Glean-u 2,000 <br />Demolition & Patch <br />General 3,000 <br />Slab 16,500 <br />Roof Cuttin 7,000 <br />Clean and Seal Slab 20,000 <br />Framin & D all 55,000 <br />Roof Patchin 5,000 <br />Caulkin and Sealants 1,000 <br />Doors & Hardware 7,000 <br />Acoustical Ceilin s 12,000 <br />Paintin 10,000 <br />FRP Board 5,000 <br />Fire Extin uishers 2,000 <br />HVAC Extension 12,000 <br />Fire S rinkler Extension 7,000 <br />Fire Alarm S stem Extension 3,000 <br />Plumbin -Drains & Su I 70,000 <br />Sink Hand Wash x 6 3,000 <br />Circulatin Hot Water Heater 8,000 <br />Electrical 35,000 <br />Floor thin and slo in 44,000 <br />GC Overhead 10% 34,650 <br />GC Profit 5% 17,325 <br /> <br />TOTAL ESTIMATE $401,940.00 <br />The total estimate for fixed asset facility improvements is $401,940. This amount may be <br />reduced through directly contracting with skilled craftsmen for certain components such <br />as floor tiling and sloping and installation of doors and hardware. <br />47 <br />