Orange County NC Website
Section Six -Facility Design <br />This section presents a preliminary facility design and floor layout for a shared use food <br />and agricultural processing facility in a 10,400 sq. ft. building located at 500 Valley <br />Forge Road in Hillsborough. Estimates of potential fixed-asset facility renovation costs <br />are discussed. The former Orange Enterprises Building in Hillsborough is the most <br />optimal location identified for development of a~regional shared-use food processing <br />center. <br />The existing building measures 80' by 130'. It includes a parking lot and a loading dock, <br />and is sited on approximately 4.66 acres (Orange County parcel PIN#: 9874315787). <br />The building is comprised of three general areas: A ca. 2,000 sq.ft. office area in the front <br />of the building that includes nine offices and two pairs of men's and women's restrooms; <br />a large warehouse/shop area in the middle of the building that measures approximately <br />6,500 sq.ft., and a loading and storage area in the rear that measures approximately 1,500 <br />sq.ft. All three areas are serviced by three large HVAC systems that appear to be in good <br />working order. The existing electrical boxes indicate the building is equipped with 3- <br />phase electricity capable of powering food production equipment. <br />The preliminary layout is designed to meet the overall needs of prospective users in terms <br />of layout, workflow and equipment, and to accommodate future expansion of use, <br />especially to meet the measured potential for USDA value added meat production. It is <br />important to remember that shared use facilities cannot meet all needs of all users. <br />Experienced facility managers have noted that the best shared use food processing <br />facilities meet the needs of 80% of their clients 80% of the time. Specialized or expensive <br />equipment cannot be secured for the use of only one or two users. Similarly, special <br />design elements or certifications (such as gluten-free or kosher certified) are best <br />avoided. Organic production, however, can be conducted in the same facility with <br />conventionally processed foods. <br />The design of the facility was developed with a "best fit" approach to the existing floor <br />plan of the Orange Enterprises building. Given a preexisting site, certain special <br />considerations are dictated by the site and the renovations required. <br />Bi11 Lelekacs, an engineer with the NCDA&CS Property and Construction Division, <br />assisted researchers in developing a proposed facility layout which is presented below. <br />Please note that equipment shown in the floor plan is for illustration only and does not <br />specifically match recommended equipment. The proposed renovation includes the <br />following key floor changes for the three sections of the building: <br />Front Office Area <br />Merger of two large offices to create a meeting and employee welfare room <br />measuring 15' 11" x 36' 10" <br />Creation of an open space retail area from two existing offices <br />43 <br />