Browse
Search
Agenda - 11-06-2014-11e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 11-06-2014 - Regular Mtg.
>
Agenda - 11-06-2014-11e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:02:39 PM
Creation date
11/6/2014 8:15:16 AM
Metadata
Fields
Template:
BOCC
Date
11/6/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
11e
Document Relationships
Minutes 11-06-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />Page 1 of 5 <br />Sheila Thomas -Ambat <br />Volunteer Application <br />Orange County Advisory Boards and Commissions <br />Name: <br />Ms. Sheila Thomas -Ambat <br />Name Called: <br />Home Address: <br />103 Hunter Hill Place <br />Chapel Hill NC 27517 <br />Phone (Day): <br />9192254744 <br />Phone (Evening): <br />9192254744 <br />Phone (Cell): <br />9192254744 <br />Email: <br />staemail @yahoo.com <br />Place of Employment: City of Raleigh <br />Job Title: Capital Improvement Projects Project Manager /En <br />Year of OC Residence: 2011 <br />Township of Residence: Chapel Hill <br />Zone of Residence: <br />Sex: Female <br />Ethnic Background: Asian American <br />Community Activities /Organizational Memberships: <br />American Public Works Association <br />Soceity of Women Engineers <br />Licensed Professional Engineer -- NC <br />Past Service on Orange County Advisory Boards: <br />NA <br />Boards /Commissions applied for: <br />Commission for the Environment <br />Background, education and experience relevant to this board: <br />Areas of Proficiency <br />aEoCurrently manages the design and construction of complex stormwater public infrastructure <br />projects from establishment of project scope through completion of construction through <br />communication with City staff, inspectors, design and construction teams; coordinate <br />construction activities with other City Departments, Divisions and outside agencies including <br />consultants, engineers, developers and contractors; and review project progress and quality of <br />construction. Current workload includes a 3.8 M Dam Project and 4M Linear City Stormwater <br />Infrastructure Upgrade. Currently also serves as the Stormwater Master Water Shed and <br />Systems Analysis Project Manager. <br />aEoPreviously -- Nine years of managing staff members and overseeing progressively complex <br />workloads as the Drainage Complaints and Petitions Projects Program Manager. <br />aEoProject manager and water resources technical lead for 70 existing small to mid -sized <br />funded projects with a total construction scope of approximately $4M. Creative in leveraging <br />limited resources and working effectively to maximize productivity within the program. <br />
The URL can be used to link to this page
Your browser does not support the video tag.