Orange County NC Website
12 <br />1 (delayed beyond 10 years) <br />2 $103.2 mil Net Cost of Recommendation <br />3 <br />4 Timing is Critical <br />5 Consider bond schedule, SAPFO, and construction timeline <br />6 — Discussing a May or November 2016 bond <br />7 — We expect to approach 105% LOS at elementary level in 2019 <br />8 — Current CIP shows funding in 2018 -19 for Elementary School #12 <br />9 — Planning, design, regulatory reviews, and construction take 2 -3 years (applies to <br />10 major renovations and new schools) <br />11 — If we must wait for bond approval to begin design and renovations: <br />12 Capacity relief may not be achieved until 2019 <br />13 Phasing will be more complex and expensive as we become more <br />14 crowded <br />15 We may miss the window to delay new schools <br />16 <br />17 Timing is Critical <br />18 Requested $750K in preliminary renovation planning funding <br />19 Completing one project will delay #12 by two years <br />20 <br />21 Todd Lofrese noted that the expenses for Elementary 12 and the Carrboro High School <br />22 addition are included in the ten year CIP, but if the recommended projects were completed, <br />23 these expenses could be pushed off. <br />24 Chair Jacobs said it has been stated that if the legislature keeps doing what it is doing, <br />25 there may be more students per classroom. He asked how this affects the levels of service and <br />26 the calculations. <br />27 Todd Lofrese said the current funding formulas and requirements have class size caps <br />28 on grades K -3, but they still allow flexibility in grades 4 -12. He said if changes occur to these <br />29 numbers, it could impact the timing need of new schools. He said Morris Grove is an excellent <br />30 example of that. <br />31 Chair Jacobs asked if anyone is doing any worst case scenario planning. <br />32 Todd Lofrese said he has not been doing any facility planning around this scenario, but <br />33 he has been watching it from a funding perspective for teacher positions. He said the initial <br />34 blow would be to the staffing levels. <br />35 Commissioner Gordon said anything that either school district can do to facilitate this <br />36 planning for renovations at the older schools would be appreciated. She is very enthusiastic <br />37 about this and she applauds the progress. <br />38 Chair Halkiotis said Interim Superintendent Del Burns and staff are looking at planning <br />39 moneys that could be used in moving ahead. <br />40 Pam Jones said OCS is more focused on the secondary level for new facilities. She <br />41 said there is funding in 2016 -17 for the wing for Cedar Ridge High school, and this would also <br />42 benefit from early planning, as it will likely take 2 years. She said their needs may be on a <br />43 different level than CHCCS, but they are very similar. <br />44 Michelle Brownstein said she would request that the planning include discussion of how <br />45 to logistically manage moving children and doing so many different facilities. She said there is <br />46 an urgency to this, and the more proactive planning that can be done the better. They need to <br />47 get money to plan the renovations soon. Otherwise it will be too late to do renovations and <br />48 increase capacity at the older schools and they will need to go ahead and build new schools. <br />49 She said planning cannot be limited to retreats and the date of the next joint meeting. She said <br />