Browse
Search
Agenda - 02-07-2008-6
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-07-2008
>
Agenda - 02-07-2008-6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:27:52 PM
Creation date
8/28/2008 9:38:00 AM
Metadata
Fields
Template:
BOCC
Date
2/7/2008
Document Type
Agenda
Agenda Item
6
Document Relationships
Minutes - 20080207
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option C: <br />SHSC Addition and Subsequent Addition of DSS Building <br />Estimated Total <br />Minimum Cost <br />Addition to SHSC: <br />• Assume 25,000 square foot addition to <br />SHSC @$350/s.f.f <br />• Assume SHSC expansion would be <br />completed no later than 3 years 6 <br />months after Board approves the <br />action. This includes 9 months SUP <br />Modification and 6 months ZCP, 6 <br />months planning, 20 months <br />construction and 1 month for architect <br />selection with Board approval. <br />Anticipated completion would therefore <br />be around January 1, 2012. This is an <br />aggressive time line. <br />• Assumes DSS would occupy new <br />space in order to maximize <br />reimbursement at the rate of 50% over <br />20 year depreciation schedule. <br />• Assume Board approves project no <br />later than July 1, 2008. <br />SHSC upfit of space vacated by DSS as <br />they move to the new section of the <br />building; <br />• Assume 10,000 square feet @$250/s.f <br />$8,750,000 <br />$2,500,000 <br />Estimated Total <br />Cost After <br />Anticipated <br />Reimbursements <br />$4,375,000 <br />$2,500,000 <br />Total Addition to SHSC $11,250,000 $6,875,000 <br />Construction of DSS building: <br />• Assume 50,000 s.f. DSS building <br />• Assume the completed building will <br />accommodate needs for five years <br />after completion of construction. This <br />would place commencement of <br />construction of new DSS building <br />sometime in 2017. <br />• Based on a very conservative 4% per <br />year construction cost escalation, the <br />square footage cost in 2017 is <br />estimated to be $426 square foot or <br />$21,291,426. $21,291,426 $10,645,713 <br />Grand Total of both additions: $31,937,139
The URL can be used to link to this page
Your browser does not support the video tag.