Orange County NC Website
rising demand for expanded health care through public health departments. The <br />demand for primary care and refugee services has already outstripped the <br />physical space available. <br />ifa large single service location option is fully developed, basic or triage public <br />health services would likely be offered through smaller clinics staffed by one or <br />two persons located strategically throughout the County. Should that service <br />delivery method be employed, it is possible that a smaller clinic would remain at <br />the Whitted Building, with the main clinic located at the Homestead Road <br />Campus. Should this come to fruition, expansion of the SHSC greater than what <br />was originally contemplated is likely. <br />The modified health service delivery plan is only in discussion stages at this <br />point Implementation would be several years hence and predicated upon reliable <br />public transportation within all parts of the County. It is raised here, however, to <br />acknowledge the possibility that the SHSC may require a footprint significantly <br />larger than previously discussed; or that a second human services building on <br />the Homestead Road Campus may be needed. <br />In the meantime, planning for re-location of the Dental Clinic, currently operating <br />from leased space at the Carr Mill Mall, should begin within the near-term. If <br />fiscally possible, it is recommended that funding for project planning of the new <br />dental clinic be appropriated in the 2007-2008 C1P. This would allow the County <br />to move forward with a modification to the SHSC SUP permit and be ready for <br />construction as funding becomes available. <br />The lease at Carr Mill Mall covers both the area occupied by the Dental Clinic and <br />that occupied by the Public Defender. The Public Defender could be relocated to <br />County-owned property in Hillsborough upon completion of the Justice Facilities <br />Project, thereby vacating the entire leased premises at Carr Mill Mall. Although <br />the County will need a three-year renewal of the lease at Carr Mill Mail to ensure <br />sufficient space is available for both the Public Defender and the Dental Clinic, <br />the end is in sight for the over $105,000 annual lease cost. <br />As a point of reference, $105,000 would support debt service of approximately <br />$1million. The last cost estimate for a dental clinic, now in need of updating, was <br />$2 Million. <br />The timeline for the funding of this project remains as a 2A project, which <br />provides funding during FY 2011, FY 2012 or FY 2013. <br />Update: SHSC Residence <br />This little house was designated in the original space study (2000) as a <br />"conference center". which essentially consisted of two meeting areas, a <br />kitchenette and an outside deck area that could be used for a variety of fair- <br />weather activities. The house backs up to a park-like area that was envisioned to <br />be "blankets-on-the-ground" seating area for performers that may have used the <br />XIII