Browse
Search
Agenda - 02-05-2008-6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-05-2008
>
Agenda - 02-05-2008-6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 9:58:22 PM
Creation date
8/28/2008 9:36:23 AM
Metadata
Fields
Template:
BOCC
Date
2/5/2008
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20080205
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
RES-2008-012b The Bluffs at Moorefields Resolution of the Orange County BOCC
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />RECOMMENDATION <br />OF THE <br />ORANGE COUNTY PLANNING BOARD <br />Date: Novem_b LLIQDZ <br />Name of Subdivision: The C3I ffs at Moorefia1da <br />Owner/Applicant: S'hristonher Roar) Realty Inc. <br />The Planning Board hereby recommends that the Orange County Board of County <br />Commissioners approve The Bluffs at Moorefields subdivision preliminary plat, dated <br />April 17, 2006 as revised by surveyor Steve F. Yuhasz on April 18, 2007 for the <br />construction of Peninsula Lane and Grassland Court, public roads in Orange County, <br />subject to the fulfillment of conditions specified herein. <br />Before the Final Plat of The Bluffs at Moorefields can be recorded the following <br />conditions must be satisfied: <br />A. Sewage Disposal <br />1. Each residential lot shall contain an adequate area for septic disposal, <br />and repair area, approved by the Orange County Division of <br />Environmental Health. <br />2. The septic system location may restrict the size and location of <br />improvements. This disclosure shall be included in a document <br />describing development restrictions to be recorded concurrently with the <br />Final Plat. The document shall also disclose that information regarding' <br />the tentative location of septic systems is available from the Orange <br />County Health Department, Division of Environmental Health. <br />B. Roads and Access <br />1. Peninsula Lane and Grassland Court shall be constructed to standards of <br />the North Carolina Department of Transportation, within a 50-foot <br />right-of-way with 5-foot utility easements on each side; and the <br />construction shall be inspected and approved by NCDOT. <br />OR <br />'A letter of credit or escrow agreement shall be submitted and approved by <br />the County Attorney to secure construction of Peninsula Lane and <br />Grassland Court to the standards of the North Carolina Department of <br />Transportation. An estimate of the construction cost must be prepared by <br />a certified/licensed engineer or grading contractor and- submitted to the <br />Planning and Inspections Department. The financial guarantee must <br />reflect 110% of that estimate and be issued by an accredited financial <br />institution licensed to do business in North Carolina. <br />The document describing development restrictions to be recorded with the
The URL can be used to link to this page
Your browser does not support the video tag.