Browse
Search
Agenda - 02-05-2008-4l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-05-2008
>
Agenda - 02-05-2008-4l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:00:47 PM
Creation date
8/28/2008 9:35:40 AM
Metadata
Fields
Template:
BOCC
Date
2/5/2008
Document Type
Agenda
Agenda Item
4l
Document Relationships
2008-011 Manager - Hertzon Research LLC for Public Survey for Local Rev
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20080205
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To. Mr. Rod Visser -3- <br />County of Orange <br />Referendum Survey Proposal <br />24 January 2008 <br />o Once interviewing is completed, preliminary top-line results will be delivered within 24 <br />hours. <br />o The other deliverables will require 4. to 5 business days to produce, to allow sufficient <br />time for coding of verbatim responses, accurate output and tabulation of data, data <br />analysis, complete and accurate reporting, and quality assurance at all of these steps. <br />o Results will be delivered to you or your designee, for presentation to the Board of County <br />Commissioners, in a presentation-quality MS PowerPoint report in time for the Board's <br />meeting on Tuesday, 19 February. <br />Project Timeline <br />5 <br />e Hertzog Research will work with Orange County on questionnaire drafting, and will obtain <br />the most recent list of registered voters from the Board of Elections. <br />o IMPORTANT. In order to meet Orange County's deadline for report delivery, <br />anal questionnaire approval must be obtained no later than 12:00 noon on <br />Wednesday, 30 January 2008. No further substantive changes to the <br />questionnaire, other than simple text corrections, can be made after that time <br />without slippage in the deadline and an increase in cost. <br />• Assuming the above deadline is kept, interviewing will begin Wednesday, 6 February, and <br />will continue through Tuesday evening, 12 February, unless the quota of 400 interviews is <br />met before that time. <br />Hertzog Research will deliver to Orange County a brief "top-line" report of preliminary <br />results no later than end-of-day Wednesday, 13 February. <br />Hertzog Research will deliver the draft PowerPoint report, and a set of clean, complete, <br />and correct data tables, to Orange County on Tuesday, 19 February, in time for the Board <br />of County Commissioners' meeting. <br />• I will also be happy to meet with your senior management team to discuss the findings, <br />work with your team on desired revisions, and to present or assist in presenting the <br />findings (if you so desire) to your Board of County Commissioners.
The URL can be used to link to this page
Your browser does not support the video tag.