Browse
Search
Agenda - 01-16-2008-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 01-16-2008
>
Agenda - 01-16-2008-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2018 8:38:04 AM
Creation date
8/28/2008 9:34:17 AM
Metadata
Fields
Template:
BOCC
Date
1/16/2008
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20080116
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Construction Option <br /> New Construction Assumptions <br /> Assumes DSS has adopted service model for primary service <br /> delivery location to be Chapel Hill,with satellite offices for critical <br /> services in Hillsborough. <br /> DSS building maximum of 50,000 square feet to be built <br /> Location to be Southern Human Services Center, Chapel Hill Estimated new construction cost at$350/s.f.- <br /> Health Department would occupy space vacated at current SHSC <br /> projection includes permits,alke fees,and Reimbursement based on depreciation <br /> (apprOx 10K s.f.). construction.No land costs included. schedule over twenty years.$7.5 million <br /> \ reflects total at end of 20 years. <br /> slmae , oa <br /> Cost�After <br /> Estimated Total A ticipated Some Med Max$may be available to offset cost <br /> Minimum Cost L,Reimbursements <br /> Estimated construction costs for 50,000 s.f. DSS building $17,500,000 $8,750,000 <br /> Estimated furniture/fixtures for new building(s) $1,000,000 $500,000�me-Med $may be available to offset cost <br /> Estimated upfit costs of vacated space for health department at <br /> SHSC $3,000,000 \$3,000,000 <br /> Addition to SHSC to accommodate future Health/Housing growth $0 \ $0 <br /> Equipment to upfit new clinic space $500,000 $500b0.,Some Med Max$may be available to offset costs <br /> Upfit of Whiffed space for health department, assuming DSS uses an <br /> estimated 5000 s.f.for satellite center $11,800,000 $11,800,000 <br /> Total $33,800,000 $24,550,000 <br /> What we have at the end of this project: <br /> At the SHSC we would have approximately 50,000 square feet of <br /> space for Social Services;and an additional approximately 12,000-- <br /> 15,000 square feet for Health Department,which would allow the Assumes health takes approximately 12,000--15,000 ss.of space occupied currently by DSS. <br /> relocation of the Dental Clinic from Carr Mill Mall and some (DSS would retain about 5,000 sf). Upfit estimated at$200/s.f.which includes all design <br /> costs,permits and construction,but does not include equipment necessary to outfit clinics or <br /> expansion of the personal health clinics. dental clinic. This work would need to be completed no later than 2011 when dental clinic <br /> The Whiffed Building contains approximately 59,000 square feet in lease expires. Cost of parking lot improvements or site work has not been calculated and is <br /> two buildings, much of which could be allocated to the Health <br /> Department for program space. DSS has expressed the need to <br /> maintain a satellite office of approximately 5,000 s.f. to deliver <br /> critical services that must be provided at both locations. <br /> 01/14/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.