Orange County NC Website
DocuSign Envelope ID: CC61AD51-9200-4DEB-BBDA-E50D8BB74136 <br /> Wayne Fenton <br /> Roof replacement design and consulting services <br /> New Courthouse <br /> Sectors 1,7,and 8 <br /> Hillsborough,NC <br /> SthWall Proposal No. 14-08-18 <br /> August 15,2014 <br /> Page 2 <br /> • Plans, technical specifications, general conditions, and bidding documents. Roof <br /> design to address but not necessarily be limited to such items as: <br /> Wind uplift <br /> Fire resistance of the roof assembly <br /> Current codes and standards <br /> Moisture transmission(vapor retarder)requirements <br /> Drainage requirements <br /> Type of insulation <br /> Roof system type <br /> Warranty <br /> Sheet metal flashings <br /> Perimeter and penetration terminations <br /> • Preparing an opinion of estimated construction cost <br /> • Preparing an opinion of estimated project schedule <br /> B. Bidding <br /> 1. Attending Pre-Bid Conference <br /> 2. Preparing and distributing Minutes of the Pre-Bid Conference <br /> 3. Preparing any required addenda to the plans and specifications <br /> 4. Addressing Contractor and Owner questions during the bid period <br /> 5. Assisting in review of bids and making appropriate recommendations <br /> C. Contract Administration <br /> 1. Preparing the contract between Owner and Contractor <br /> 2. Reviewing Contractor submittals <br /> 3. Attending Pre-Construction Conference <br /> 4. Preparing and distributing Minutes of the Pre-Construction Conference <br /> 5. Attending periodic progress meetings <br /> 6. Addressing Contractor and Owner questions during construction <br /> 7. Review Contractor Pay Requests <br /> D. Construction Quality Assurance <br /> 1. Performing periodic site visits during construction to assure that work is being performed <br /> in accordance with the plans and specifications. <br /> During our site visits we will meet with your personnel,attend scheduled meetings,check <br /> materials, observe construction in progress, examine completed work, and discuss future <br /> work. A report summarizing our observations will be provided to Orange County. <br /> i <br /> Based on our understanding of the current scope of work, we anticipate the duration of j <br /> construction to be approximately 30 consecutive calendar days. <br /> i <br /> 9601 Baileywick Rd• Raleigh, NC 27615 www.5thwallbdc.com <br /> 919/616-4715 <br />