Browse
Search
2014-539-E AMS - 5th Wall Building Diagnostics Consulting for roof replacement and consulting services for new courthouse $8,800
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-539-E AMS - 5th Wall Building Diagnostics Consulting for roof replacement and consulting services for new courthouse $8,800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 9:05:44 AM
Creation date
10/20/2014 7:56:45 AM
Metadata
Fields
Template:
BOCC
Date
10/20/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Amount
$8,800.00
Document Relationships
R 2014-539 AMS - 5th Wall Building Diagnostics Consulting for roof replacement, consulting services for new courthouse
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: CC61AD51-9200-4DEB-BBDA-E50D8BB74136 <br /> u <br /> LL <br /> bULPING PlAg,1o6TiCS CaNeULTaNT5 <br /> August 15,2014 <br /> Wayne Fenton <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> PO Box 8181 <br /> Hillsborough,NC 27278 <br /> RE: Roof replacement design and consulting services <br /> New Courthouse <br /> Sector 1 (4,800 square feet approximately) <br /> Sector 7(150 square feet approximately) <br /> Sector 8(180 square feet approximately) <br /> 106 East Margaret Lane <br /> Hillsborough,NC <br /> SthWall Proposal No. 14-08-18 <br /> Dear Mr.Fenton: <br /> At your request we have prepared this proposal for providing selected services for the referenced project. <br /> Generally, the services to be provided include preparation of design documents for remedial roofing of <br /> Sectors 1, 7, and 8 at the New Courthouse. Also included is administration of the project during <br /> construction. <br /> All sectors exhibit existing single ply(EPDM)roof systems, all of which have exceeded their useful life. <br /> All sectors currently exhibiting extensive deterioration and evidence of moisture intrusion. Current <br /> budget for replacement per the 2012 Roof Asset Management Program Update is as follows: <br /> Sector 1 $88,000 <br /> Sector 7 $ 2,800 <br /> Sector 8 $ 3,300 <br /> The budget assumes upgrading to current building code. <br /> Professional Services <br /> In general our services will consist of the following: <br /> A. Design <br /> 1. Meeting with representatives of Orange County to discuss the parameters of the project. <br /> 2. Reviewing documentation regarding the existing roof systems. <br /> 3. Preparing design documents to include: <br /> 9601 Baileywick Rd• Raleigh, NC 27615 www.5thwallbdc.com <br /> 919/616-4715 <br />
The URL can be used to link to this page
Your browser does not support the video tag.