Orange County NC Website
E. Parkland <br />LawFul currency of the United States in the amount of $7.735.00 shall be <br />paid to Orange County as payment in lieu of parkland dedication prior to <br />recordation of the final plat. <br />2. The developer has offered and shall transfer in fee simple a total of 14.95 <br />acres of open space (44.49%) to the Homeowner's Association. This open <br />space shall be shown and labeled accordingly on the final, plat. All <br />maintenance responsibilities for the open space shall be with the <br />. Homeowner's Association. <br />3. The second paragraph of Section IV-B-7-b of the Orange County <br />Subdivision Regulations references the required minimum recreation <br />space ratio in the Orange County Zoning Ordinance, Article 5.1.1, which <br />requires 0.028 square feet of recreation space per land area dedicated to <br />residential use [0.028 * 35.22= .98 acres or 42,688.8 square feet]..In <br />those cases where the required minimum recreation space results in a <br />larger amount than the public recreation space requirement of 1/20 acre <br />per lot, the difference shall be established as private recreation space for <br />the use of the residents of the development (42,688.8 - 37,026 = 5,662.8 <br />square feet (.13 acres). The developer has planned 14.95 acres of open <br />space (44.49%) to be owned and maintained by the Homeowner's <br />Association. <br />4. Developer shall provide a minimum of 5,662.8 square feet of private <br />recreation area (e.g. trails, all-purpose field, etc.). <br />5.. An Open Space area with a minimum width of ten (10) feet shall be <br />provided between lots 11 and 12 in order to provide access from <br />Grassland Court to the open space along the eastern boundary of the <br />property. <br />F. Construction Waste <br />1. Per the Orange County Solid Waste Ordinance, clean wood waste, scrap <br />metal and corrugated cardboard, all present construction waste, shall be <br />recycled. <br />2. All haulers of construction waste shall be properly licensed. Developer <br />shall confirm that hauling contractors are licensed to haul waste in Orange <br />County. <br />3. Prior to any demolition or construction activity on the site the applicant <br />shall hold apre-demolition/pre-construction conference with the County's <br />.Solid Waste staff. This may be the same meeting held with other <br />development officials. <br />