Orange County NC Website
MEMORANDUM OF UNDERSTANDING SUPPORTING VOLUNTARY & TEMPORARY REVISIONS TO ENO <br />RIVER FLOW MANAGEMENT PRACTICES FOR THE WEST FORK ENO RESERVOIR AND LAKE ORANGE <br />The Town of Hillsborough and Orange County agree to modify our current practices for management of <br />the Eno River flow through the Hillsborough USGS stream gauge. These modifications are made <br />primarily in consideration of the concerns of property owners /residents along the shoreline of Lake <br />Orange, Lake Orange Incorporated, and recreational users of Lake Orange, who desire Lake Orange to be <br />maintained at a level no lower than 24 inches below full, to the extent possible. It is noted that the <br />Town of Hillsborough is not required to take these steps; however, the town is is giving up a portion of <br />its water capacity to be a good partner to Lake Orange stakeholders in good faith. <br />Between the months of April and October each year that this agreement is active: <br />The Town of Hillsborough agrees to provide the required instream flow requirement at the <br />Hillsborough Gauge that is currently required from Lake Orange (varies, based on the Lake <br />Orange water level), as well as the water usage requirements of the Town of Hillsborough, <br />Orange- Alamance Water System, and Piedmont Minerals through releases from the West Fork <br />Eno Reservoir (WFER). <br />Orange County agrees to provide the required instream flow requirement at the Hillsborough <br />Gauge that is currently required from the WFER (1.0 cubic feet per second) through releases <br />from Lake Orange. <br />The goal of these management modifications is to maintain Lake Orange water levels within 24 inches <br />from full pool (615') during the months of April through October each year. This is the primary period <br />for recreation within Lake Orange. Compliance with this agreement is contingent upon adequate <br />seasonal water supplies available to fulfill the demands of the water users that are part of the Voluntary <br />Capacity Use Agreement. <br />This agreement shall have an initial term through December 2015. It is anticipated that the Town of <br />Hillsborough will begin construction of Phase 2 of the West Fork Eno Reservoir in 2016 (or shortly <br />thereafter). During construction, this modification to the Eno River flow management will not be <br />possible. Reinstatement of these management practices may be considered upon completion of <br />construction of WFER Phase 2. <br />If, at any time, for any reason, either the Town of Hillsborough or Orange County decides to withdraw <br />from this agreement, the management practices set forth in the Voluntary Capacity Use Agreement <br />(Table 1 -Eno River Water Management Plan, current revision) shall be reinstated. The Voluntary <br />Capacity Use Agreement remains the legal plan of record. <br />TOWN OF HILLSBOROUGH <br />Kenneth P. Keel, PE, Town Engineer <br />(Staff manager of WFER releases) <br />Date: f <br />ORANGE COUNTY <br />ql�v- 4�L <br />Kevin Lindley, PE, Staff Engineer <br />(Staff manager of Lake Orange releases) <br />Date:-.... - 011. r 1 11 ! <br />