Browse
Search
Agenda - 10-21-2014-13 (3)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 10-21-2014 - Regular Mtg.
>
Agenda - 10-21-2014-13 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 12:23:15 PM
Creation date
10/17/2014 2:54:25 PM
Metadata
Fields
Template:
BOCC
Date
10/21/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
13-3
Document Relationships
Minutes 10-21-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
S Memorandum of Understanding Supporting Voluntary & Temporary Revisions to Eno River Flow Management Practices for the West Fork Eno Reservoir and Lake Orange
(Linked To)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING SUPPORTING VOLUNTARY & TEMPORARY REVISIONS TO ENO <br />RIVER FLOW MANAGEMENT PRACTICES FOR THE WEST FORK ENO RESERVOIR AND LAKE ORANGE <br />The Town of Hillsborough and Orange County agree to modify our current practices for management of <br />the Eno River flow through the Hillsborough USGS stream gauge. These modifications are made <br />primarily in consideration of the concerns of property owners /residents along the shoreline of Lake <br />Orange, Lake Orange Incorporated, and recreational users of Lake Orange, who desire Lake Orange to be <br />maintained at a level no lower than 24 inches below full, to the extent possible. It is noted that the <br />Town of Hillsborough is not required to take these steps; however, the town is is giving up a portion of <br />its water capacity to be a good partner to Lake Orange stakeholders in good faith. <br />Between the months of April and October each year that this agreement is active: <br />The Town of Hillsborough agrees to provide the required instream flow requirement at the <br />Hillsborough Gauge that is currently required from Lake Orange (varies, based on the Lake <br />Orange water level), as well as the water usage requirements of the Town of Hillsborough, <br />Orange- Alamance Water System, and Piedmont Minerals through releases from the West Fork <br />Eno Reservoir (WFER). <br />Orange County agrees to provide the required instream flow requirement at the Hillsborough <br />Gauge that is currently required from the WFER (1.0 cubic feet per second) through releases <br />from Lake Orange. <br />The goal of these management modifications is to maintain Lake Orange water levels within 24 inches <br />from full pool (615') during the months of April through October each year. This is the primary period <br />for recreation within Lake Orange. Compliance with this agreement is contingent upon adequate <br />seasonal water supplies available to fulfill the demands of the water users that are part of the Voluntary <br />Capacity Use Agreement. <br />This agreement shall have an initial term through December 2015. It is anticipated that the Town of <br />Hillsborough will begin construction of Phase 2 of the West Fork Eno Reservoir in 2016 (or shortly <br />thereafter). During construction, this modification to the Eno River flow management will not be <br />possible. Reinstatement of these management practices may be considered upon completion of <br />construction of WFER Phase 2. <br />If, at any time, for any reason, either the Town of Hillsborough or Orange County decides to withdraw <br />from this agreement, the management practices set forth in the Voluntary Capacity Use Agreement <br />(Table 1 -Eno River Water Management Plan, current revision) shall be reinstated. The Voluntary <br />Capacity Use Agreement remains the legal plan of record. <br />TOWN OF HILLSBOROUGH <br />Kenneth P. Keel, PE, Town Engineer <br />(Staff manager of WFER releases) <br />Date: f <br />ORANGE COUNTY <br />ql�v- 4�L <br />Kevin Lindley, PE, Staff Engineer <br />(Staff manager of Lake Orange releases) <br />Date:-.... - 011. r 1 11 ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.