Browse
Search
Agenda - 10-21-2014 - 7e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 10-21-2014 - Regular Mtg.
>
Agenda - 10-21-2014 - 7e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 12:26:20 PM
Creation date
10/17/2014 2:49:57 PM
Metadata
Fields
Template:
BOCC
Date
10/21/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7e
Document Relationships
Minutes 10-21-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
RES-2014-066 Resolution of the BOCC approving Stroud's Creek Preliminary Subdivision Plat dated 8-13-2014
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />Water and Sewer Service: The property is located within a <br />primary public utility service area according to the Water and <br />Sewer Management Planning Boundary Agreement <br />(WASMPBA). The proposed residential lots will be served with <br />public water (via a 4" domestic and 8 -12" fire lines), and public <br />sewer (via an 8" sanitary sewer line) by the Town of <br />Hillsborough. <br />Surrounding Land Uses: a. NORTH: Stroud's Creek Road; an undeveloped single - family <br />residential subdivision comprised of 40 lots all ten acres <br />or more in size. <br />b. SOUTH: Property is within the corporate limits of the Town of <br />Hillsborough. The property is slated for development as <br />an office / industrial park. There is also an undeveloped <br />78 acre parcel within the County's planning jurisdiction <br />that is zoned AR. <br />c. EAST: Church on property zoned AR; NC Highway 57. <br />d. WEST: Pathways Elementary School zoned AR. <br />STAFF NOTE: Although surrounding uses are zoned AR, the land use <br />activity within the area, including the properties to the south, is urban in <br />nature with high traffic volume during both weekday and weekend time <br />periods. <br />Development Process, Schedule, and Action: The typical cadence for the review of a <br />major subdivision is as follows: <br />• First Action — Planning staff schedules a Neighborhood Information Meeting (NIM). <br />Staff Comment — DONE. This meeting was held on May 14, 2014. <br />• Second Action — The Planning Board reviews and takes action on the Concept <br />Plan application approving either the `conventional' or `flexible development' layout. <br />Staff Comment — DONE. The Planning Board reviewed the Concept Plan at its <br />June 4, 2014 regular meeting and approved the Flexible Design Option. Agenda <br />materials from this meeting can be viewed at: <br />http: / /orangecountync.gov /planning /documents / .4.14P Packet.pdf <br />Minutes for this meeting are available at: <br />http-//oranqecountvnc.qov/planning/document /6414PBMi nutes.pdf <br />• Third Action — Once a concept plan is approved, the Planning Board reviews and <br />makes a recommendation on the approval of the Preliminary Plat for the project. <br />Staff Comment. The Planning Board met on September 3, 2014 and <br />unanimously recommended approval of the Preliminary. Agenda materials from <br />the meeting can be viewed at: <br />http: / /orangecountync.gov /planning /documents /9.3.14P PAC T.pdf <br />Minutes for this meeting are included as Attachment 4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.