Orange County NC Website
Page 3 of 6 <br />EK <br />5. Metal Scrap (metal wastes are required by ordinance to be recycled) <br />No metal waste will be produced (proceed to # 6) <br />Segregated for on -site recycling collection <br />Recycle at Orange County Landfill (no tip fee charged) <br />If any structure described above is greater than 500 ft2, it must be assessed for deconstruction possibilities. <br />Segregated for hauling to scrap dealer by general contractor <br />Could the structure(s) be moved from the site? YES NO Don't Know <br />Segregated for hauling to scrap dealer by sub - contractor <br />Please explain: YES NO <br />Certified Commingled Recycling Facility <br />What is the timetable on removal of the structure(s)? <br />Other (specify): <br />0 <br />6. Clean Wood Wastes (clean wood wastes are required to be recycled) <br />No clean wood wastes will be produced (proceed to # 7) <br />Segregated for on -site recycling collection <br />Recycle at Orange County Landfill (reduced tip fee charged) <br />If any structure described above is greater than 500 ft2, it must be assessed for deconstruction possibilities. <br />Saved and used on future jobs <br />Could the structure(s) be moved from the site? YES NO Don't Know <br />Separated for private salvage or charity <br />Please explain: YES NO <br />Certified Commingled Recycling Facility <br />What is the timetable on removal of the structure(s)? <br />Other (specify): <br />© <br />7. Demolition/Salvage of <br />No structure(s) will be removed (proceed to Construction Waste section) <br />Structure(s) must be removed. Please describe (include square footage for each structure): <br />If any structure described above is greater than 500 ft2, it must be assessed for deconstruction possibilities. <br />Please call Solid Waste Staff at (919) 968 -2788 x107 or x109 to arrange an assessment. <br />Could the structure(s) be moved from the site? YES NO Don't Know <br />Has the sale or donation of the structures been considered? <br />Please explain: YES NO <br />How will the structure be removed otherwise? <br />What is the timetable on removal of the structure(s)? <br />Are there salvageable materials (hardwood floors, fixtures, <br />molding, that can be removed for reuse prior to demolition? <br />If Yes, Please list (use a separate sheet if necessary): <br />YES NO Don't Know <br />Have, or will, these materials been offered for sale or donation? YES NO <br />24 <br />