Orange County NC Website
Orange County Erosion Control / Stormwater Comments: <br />1. Preliminary plan is acceptable with regards to Erosion Control and Stormwater. <br />However, official permit submittals will be necessary at construction drawing phase with <br />specific designs and supporting calculations. <br />2. Please also coordinate with us and the Fire Marshal to avoid conflicting requirements for <br />BMPs and Fire Ponds. <br />Orange County DEAPR: <br />1. None <br />Town of Hillsborough Comments: <br />1. See attached letter from town of Hillsborough Planning Director. <br />Staff looks forward to continuing our work with you on the Pleasant Green Woods Phase <br />IV project. Should you have any additional questions, please call me at (919) 245 -2577, or e- <br />mail me at pmallettL&oran eg countync.gov. <br />Very Respectfully, <br />Pd'wl_- /tl M&S <br />Patrick R. Mallett, Planner II <br />Orange County Planning & Inspections Department <br />Attachments: <br />1. Orange County Health Department Memo dated July 30, 2014 <br />2. Solid waste management Memo dated July 18, 2014 and SWM Application <br />CC: <br />Michael Harvey, Current Planning Supervisor; <br />Craig Benedict, Planning Director; and <br />File. <br />3 <br />21 <br />