Orange County NC Website
Phase the reports shall compare the actual construction dates <br />to scheduled construction dates of each separate construction <br />contract and to the Master Schedule for the Project. <br />3.7.3 Proiect Cost Reports <br />tNot Used.l the rnA ~h.,u r. ^,} rl~~}rih„+e ., a^} ^„~+ <br />..r4c .. i.^+hl., hnc-ic +h n+ chnll c nifi, +hc nn}, ,.,I n nrA <br />i.^+c n rar7 4n }I.c Dri.icn+ ('_„nrn n}o e.-I nAnvim„m Dri^e <br />3.7.4 Cash Flow Report <br />fNot Used.l <br />t#e~~T#o-ERs sga;fsp•e~zhe .,,ro--~t~rr-,„I ^.,sp "~,., <br />3.7.5 Change Order Report <br />The CM shall prepare and distribute Design Phase reports on a <br />monthly basis that shalt list all Owner-approved addenda, <br />substitutions and change orders as of the date of the report <br />and shall state the effect of the changes on the Project and <br />Construction Budget and the Master Schedule. The GM shall <br />continue to prepare and distribute monthly change order <br />reports during the Construction Phase. The report shall include <br />logs of all requests for information, requests for interpretation of <br />the design documents, requests for proposals, notices of <br />events that might justify an adjustment in the Guaranteed <br />Maximum Price or Master Schedule, and status of critical <br />decisions to be made by the Owner or the Designer. The <br />report shall list all Owner-approved change orders by number, <br />a brief description of the change order work, the cost <br />established in the change order and percent of completion of <br />the change order work. The report shall also include similar <br />information for potential change orders or impact on the <br />Guaranteed Maximum Price of which the CM maybe aware. <br />3.7.6 Proiect and Construction Budget Revisions <br />The CM shall make recommendations to the Owner concerning <br />construction changes that may result in revisions to the Project <br />Guaranteed Maximum Price. <br />3.7.7 Progress Payment Reports'~~^h~'; <br />The CM shall prepare and distribute the progress payment <br />reports. The reports shall state the total construction contract <br />price, payment to date, current payment requested, retainage, <br />sales and use tax paid, and actual amounts owed this period. <br />A portion of this report shall be a certificate of payment that <br />shall be signed by the GM and delivered to the Designer and <br />the Owner. <br />3.7.8 Contractor's Safety Program <br />On a monthly basis, the CM shall review the safety programs of <br />each Contractor and confirm that each Contractor has <br />established and implemented safety programs as required by <br />the Contract Documents. <br />3.7.9 Final Inspections and Commissioning <br />The GM shall schedule final inspections and, if required by the <br />Contract Documents, commissioning of systems in the Project, <br />and shall compile and organize all inspection reports for the <br />Project records. <br />3.7.10 Closeout Reports <br />At the conclusion of the Project, the CM shall prepare final <br />project accounting and closeout reports. <br />3.7.11 MIS Reports for Move-in and Occupancy <br />fNot Used.l I^ ^ nl+n+ii.^ ,nii+h +hc n , ^er }hc ne^:.,^er .,..,a <br />in+c n„In+i.r., n +hc (`nA chnll v .gyn.-I <br />3.8 Design Phase Services <br />All drawings and specifications shall be prepared by the <br />Designer and submitted to the Owner for review and <br />authorization to proceed with procurement and construction. <br />The CM shall provide the following services related to design of <br />the Project. <br />3.8.1 Project Conference <br />In accordance with the approved Construction Management <br />Plan and Master Schedule, the CM shall conduct a project <br />conference attended by the Designer, the Owner and others as <br />necessary. During the Project Conference, the CM shall review <br />the Construction Management Plan, the Master Schedule, the <br />Design Phase Milestone Schedule and the Project Guaranteed <br />Maximum Price,, '^rthe n"'c~~le The CM shall conduct and <br />prepare minutes of this meeting. <br />3.8.2 Design Phase Information <br />The GM shall monitor the Designer's compliance with the <br />Construction Management Plan °^~''^~' +h~,~-rrr~-~,ren"'~"'~ nd the CM shall <br />9 <br />