rn~,gased on the Construction Management Plan and <br />the Construction Market Survey, if needed, the CM shall <br />prepare a Project and Construction Budget based on separate <br />divisions of the Work required for the Project and shall identify <br />contingencies for design and construction. The CM shall submit <br />the Project and Construction Budget to the Owner for <br />acceptance. If the CM believes that additional surveys. <br />geotechnical investigations, environmental assessments or <br />other testing or investigation is necessary and reasonable to <br />fashion a reliable Project and Construction Budget, the CM <br />shall make recommendations to the Owner for such services, <br />with an explanation of why the CM believes that the services <br />are reasonable and necessary. The decision to procure such <br />services shall be solely in the discretion of the Owner, and shall <br />be at the Owner's expense. The Project and Construction <br />Budget shall be revised as directed by the Owner. <br />3.6.3 Preliminary Estimate and Budget Analysis <br />[Not Used.] <br />3.6.4 Cost Control <br />[Not Used.] <br />3.6.5 Project and Construction Budget Revision <br />In the event the CM and the Owner concur the Guaranteed <br />Maximum Price is likely to be exceeded because ~- <br />of any of the <br />grounds upon which the CM has the right to seek an <br />adjustment to the Purchase Price as provided in the Agreement <br />of Purchase and Sale (Library Building) and or the Agreement <br />of Purchase and Sale (Office Building). or the Owner's Interior <br />Upfit Allowance is exceeded, the CM shall make <br />recommendations to the Owner concerning design changes <br />that may result in revisions to the Project and Construction <br />Budget and divisions of the Work required for the Project. <br />3.6.6 Value Engineering Studies <br />In the event the CM and the Owner concur the Guaranteed <br />Maximum Price is likely to be exceeded because e~-~aeF- <br />.r:.e..+e,a ..+..,...,e~ +,. ++,e s +tie lA7i.rL of anY of the <br />grounds upon which the CM has the right to seek an <br />adjustment to the Purchase Price as provided in the Agreement <br />of Purchase and Sale (Library Building) and or the Agreement <br />of Purchase and Sale (Office Building), or because the Owner's <br />Interior Upfit Allowance is exceeded. the CM shall provide <br />value engineering recommendations to the Owner and <br />Designer for major construction components, including cost <br />evaluations of alternative materials and systems. <br />3.6.7 Estimates for Addenda <br />Prior to bidding, the CM shall notify the Owner and the <br />Designer if any addendum issued by the Designer could impact <br />the Cost of the Work of the Project, and will prepare an <br />estimate of costs for all such addenda and shall submit the <br />estimates to the Owner for approval. After approval by the <br />Owner, addenda shall be transmitted to bidders by the CM. <br />Once bids are received and contracts are awarded to each <br />Contractor, any addenda issued by the Designer which affects <br />a Contractor shall be processed through the change order <br />provisions in the Agreement. <br />3.6.8 Analyzing Bids: Upon receipt of bids, the GM shall <br />evaluate the bids, including alternate prices and unit prices, <br />and before award of any construction contract shall provide the <br />Owner and the Designer with a report summarizing the bids. <br />3.6.9 Schedule of Values (Each Contract) <br />The CM shall, in participation with the Contractors, determine a <br />Schedule of Values for each of the construction contracts or, if <br />the entirety of the Work is to be pertormed by a single prime, a <br />consolidated schedule of values. The Schedule of Values shall <br />be the basis for the allocation of the Construction Contract <br />price to the activities shown on the Contractor's Construction <br />Schedule. <br />3.6.10 Allocation of Costs to Contractor's Construction <br />Schedule <br />[Not used] <br />3.6.11 Change Order Control <br />The CM shall establish and implement a change order control <br />system. <br />3.6.11.1 All proposed Owner-initiated change orders shall first <br />be described in detail in writing by the Owner, or the Designer if <br />so requested by the Owner, and forwarded to the GM. The CM <br />shall then forward a request for proposal to the appropriate <br />Contractor (or Contractors), accompanied by technical <br />Drawings and Specifications prepared by the Designer. In <br />response to the request for a proposal, the Contractor shall <br />submit to the OM for evaluation detailed information concerning <br />the costs and time adjustments, if any, necessary to perform <br />7 <br />