Orange County NC Website
the Work, or a Contractor defaults and a pre-qualified <br />replacement cannot be obtained in a timely manner, and (2} <br />the Owner approves performance of the Work by the CM, <br />which approval shall not be unreasonably withheld. In the <br />event the GM pertorms a portion of the Work under this <br />paragraph, the CM shall be °^*~+'°^' +^ ~+° °^+„°' .~;r°^+ ^^^++^ <br />°ra..r.., +h° inr..r~ ^^i„~1~^...+.r°^+ i., l,..r ....~+~ ,., ~+h r .shl° <br />n•:II ^ni.r h° n:.-I if n •°rl Fwr +h° ll..rn °r n.-h.nn n° ..f <br />^°rt^r^^;^^ *+.°'nr^rl, compensated as if it were a replacement <br />Contractor and provided the GM's substituted construction <br />services do not cause the Project cost to the Owner to exceed <br />the Guaranteed Maximum Price. <br />7.1.5 Elements of the Guaranteed Maximum Price <br />The Guaranteed Maximum Price shall include the total Cost of <br />the Work, including the CM Fee for Services, the reimbursable <br />costs for General Conditions provided by the CM, if any, and <br />the CM Contingency, if any, all as defined herein. The <br />Guaranteed Maximum Price includes the cost of all labor, <br />equipment, supplies, materials, services and allowances to <br />complete the Project. The Guaranteed Maximum Price shall be <br />directly correlated to the specific design Drawings and <br />Specifications in existence at the time the Guaranteed <br />Maximum Price is prepared. The assumptions used in the <br />preparation of the Guaranteed Maximum Price shall be <br />identified by the CM in its Guaranteed Maximum Price <br />proposal. <br />7.1.6 Sales and Use Taxes <br />The Guaranteed Maximum Price shahincludes those sales and <br />use taxes applicable to the Project that are legally enacted at <br />the time the Guaranteed Maximum Price is established. Sales <br />2RE~QSe +~..°6 gh.~u +,° ..+°.+ a..r ~~~++,+h° <br />(_',.nrn nf°°rV M1Anvi m,.m ~ri^° nn.-I i +h° n °n+ nli^.~+i..n <br />. The CM shall require each Contractor to <br />account far all sales and use taxes incurred as a condition to <br />such Contractar's receiving final aavment. Each such <br />Contractor shall be required to maintain a ledger for sales and <br />use taxes paid in the Project and hard copies of all applicable <br />invoices. Any increase or decrease in sask~-the taxesrate of <br />such taxes that affect the Guaranteed Maximum Price and that <br />are enacted after the Guaranteed Maximum Price is sat3a~itted <br />established shall be incorporated into that price by change <br />order. <br />7.1.7 Change in Scope <br />The Owner may change the scope of the Project or a part <br />thereof and the Guaranteed Maximum Price shall then be <br />adjusted as provided in Paragraph 7.3. <br />7.2 Gost of the Work <br />[Not used] <br />7.2.1 Exclusions from Gost of the Work <br />The Cost of the Work shall not include the following: <br />7.2.1.1 [Not used] <br />7.2.1.2 [Not used) <br />7.2.1.3 [Not used] <br />7.2.1.4 [Not used] <br />7.3 Adjustments to the Guaranteed Maximum Price <br />The CM understands, confirms and agrees that its <br />responsibility hereunder is to construct the Project in <br />accordance with the Drawings and Specifications. It is <br />recognized that the Guaranteed Maximum Price is based on <br />complete design documents unless the Owner requests that <br />the Guaranteed Maximum Price be fixed at an earlier stage in <br />the design process, in which case the Guaranteed Maximum <br />Price includes allowances. The CM shall notify the Owner if <br />the CM believes that it is being asked to fix the Guaranteed <br />Maximum Price on incomplete, ambiguous or under-developed <br />drawings and specifications. In those instances in which the <br />Drawings and Specifications are not fully developed at the time <br />the Guaranteed Maximum Price is established, the GM shall <br />exercise reasonable care and judgment to determine the intent <br />of the design and shall calculate the Guaranteed Maximum <br />Price on the basis of the quality of construction, materials, and <br />finishes that can be reasonably inferred from the design <br />documents or other specified sources. The CM shall determine <br />unit prices and the Cost of the Work and shall make those <br />reasonable assumptions regardjng the project scope and the <br />quality of the intended construction as may be necessary to <br />fully document the Guaranteed Maximum Price. <br />7.3.1 Changes to the Work <br />The Owner may, at any time and for any reason, by written <br />notice or order, make changes or modifcations to the Work or <br />add Work within the general scope of the Project, including <br />21 <br />