Browse
Search
Agenda - 01-15-2008-4y4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 01-15-2008
>
Agenda - 01-15-2008-4y4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:19:48 PM
Creation date
8/28/2008 9:32:17 AM
Metadata
Fields
Template:
BOCC
Date
1/15/2008
Document Type
Agenda
Agenda Item
4y4
Document Relationships
Minutes - 20080115 - Late
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEG 01/07/08 edits <br />Redlined from 6126/07draft <br />ORANGE <br />COUNTY AGREEMENT FOR CONSTRUCTION nnnnin~~nn~niTMANAGER AT RISK <br />NORTH SERVICES <br />CAROLINA <br />This AGREEMENT is made and effective on this date: <br />BETWEEN The Owner: <br />ORANGE COUNTY <br />And the Construction Manager {hereinafter referred to as the "CM"): <br />TELESIS CONSTRUCTION MANAGEMENT, LLC <br />For services in connection with the Project known as: <br />The Orange County twa story Public Library and three story Office Building located an Margaret Lane in <br />Hillsborough, North Carolina, as further described in Article 2 <br />For which the Designer is: <br />Brockwell Associates, Inc., in conjunction with Gardner & McDaniel, PA, Engineered Designs, Inc. and <br />Summit Consulting Engineers, PLLC, as sub-consultant to Brockwell Associates, Inc.; andAF~~Phillip K. <br />Barton, Library interior space planner. <br />The Owner and CM, in consideration of their mutual covenants herein, agree asset forth below: <br />TABLE OF CONTENTS <br />ARTICLE 1 -RELATIONSHIP OF THE PARTIES ......................................................................................... 4 <br />1.1 Owner and Construction Manager <br />1.2 Owner and Desiqner <br />1.3 CM and Contractors <br />1.4 Relationship of the CM to the Desiqner <br />ARTICLE 2 -PROJECT DEFINITION .......................................................................................................... 4 <br />ARTICLE 3-CONSTRUCTION MANAGER'S SERVICES ................................................................................ 4 <br />3.1 CM Services <br />3.2 CM Personnel <br />3.3 Construction Management Plan <br />3.4 Consultant Selection <br />3.5 Time Management <br />3.6 Cost Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.