Browse
Search
Agenda - 01-15-2008-4y2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 01-15-2008
>
Agenda - 01-15-2008-4y2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:22:03 PM
Creation date
8/28/2008 9:31:09 AM
Metadata
Fields
Template:
BOCC
Date
1/15/2008
Document Type
Agenda
Agenda Item
4y2
Document Relationships
Minutes - 20080115 - Late
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Purchaser acknowledge that it is their intent that a total of two hundred forty-six (246) parking spaces shall be <br />allocated to Purchaser within the project complex for Purchaser's use of the Building, Units 200 and 3Q0 in <br />the Gateway Center Building and the proposed Orange County office building. Only to the extend that such <br />parking spaces cannot be accommodated within the project complex and outside the parking deck, shall <br />parking spaces be allocated to Purchaser within the parking deck. <br />5.05 As a further condition precedent to Purchaser's obligation to close the purchase of <br />the Property, Purchaser must have received underFVritin.~ approval and North Carolina Local Government <br />Commission (LGC) approval of installment purchase financing totaling at least $25,OOQ,040 to enable <br />Purchaser to purchase the Property, and other property making up the Orange County Office and Library <br />Complex. The under<vritin~ and LGC approved financing must be in compliance with Purchaser's policies of <br />15°~0 of Purchaser's General Fund Budget debt service payments and 7°.~o annual growth of Purchaser's <br />General Fund Budget. <br />SECTION b. Construction of the Building. <br />6.01 Subject to the terms, covenants and conditions set faith in this Agreement, Seller <br />shall construct, ar cause to be canstiuctect, a hyo story commercial building upon the Real Property <br />containing approximately 23,454 square feet (building footprint), the purpose of which building shall be to <br />serve as a public library (the "Building"}. The shell of the Building and the exterior improvements to the <br />Real Property shall be constructed and completed substantially in accordance with the Construction <br />Agreement and the Contract Documents referenced therein. <br />__~.__._~ ___ _ ~__ __rr-- -__..__ ___._ _.___i.___, .._ ___ ~__._ ___ ___~_ ._ri._ ., ..___, .,_..__ <br />cc _._____w, _ ..__.., <br />» w__...___., .__ ___ ___...,. ____ <br /> <br /> <br /> ? o > <br /> <br />~ ~ ~ <br /> cc » <br /> b <br /> , <br /> <br /> <br />, <br />7 <br />GG <br /> 11 <br /> <br /> <br /> CG 71 <br /> <br /> • <br /> <br />6.02 At any time from and after the Date of Agreement and until the Closing, <br />Purchaser may enter upon the Real Property and perform, at the sole cost and expense of Purchaser (but <br />not in a manner which shall unreasonably disrupt or delay construction of the Building or the Interior <br />Upfit), such analysis, review, tests or inspections of the Real Property, including construction of the <br />Building and the Interior Upfit, or any other aspect of the Real Properhf as may be pertinent and material <br />to Purchaser in its sole and absolute discretion. " ~ ~~'-~~~' ~~~"~-• ~-.,,a:~:,.,.t~~~-te +~ ~••'4 <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.