Browse
Search
Agenda - 01-15-2008-4y1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 01-15-2008
>
Agenda - 01-15-2008-4y1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:23:53 PM
Creation date
8/28/2008 9:30:09 AM
Metadata
Fields
Template:
BOCC
Date
1/15/2008
Document Type
Agenda
Agenda Item
4y1
Document Relationships
Minutes - 20080115 - Late
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CM shall make recommendations to the Owner concerning <br />construction changes that may result in revisions to the Project <br />Guaranteed Maximum Price. <br />3.7.7 Progress Payment Reports <br />The CM shall prepare and distribute the progress payment <br />reports. The reports shall state the total construction contract <br />price, payment to date, current payment requested, retainage, <br />sales and use tax paid, and actual amounts owed this period. <br />A portion of this report shall be a certificate of payment that <br />shall be signed by the CM and delivered to the Designer and <br />the Owner. <br />3.7.8 Contractor's Safety Program <br />On a monthly basis, the CM shall review the safety programs of <br />each Contractor and confrm that each Contractor has <br />established and implemented safety programs as required by <br />the Contract Documents. <br />3.7.9 Final Inspections and Commissioning <br />The CM shall schedule final inspections and, if required by the <br />Contract Documents, commissioning of systems in the Project, <br />and shall compile and organize all inspection reports for the <br />Project records. <br />3.7.10 Closeout Reports <br />At the conclusion of the Project, the GM shall prepare final <br />project accounting and closeout reports. <br />3.7.11 MIS Reports for Move-in and Occupancy <br />[Not Used.] <br />3.8 Design Phase Services <br />All drawings and specifications shall be prepared by the <br />Designer and submitted to the Owner for review and <br />authorization to proceed with procurement and construction. <br />The CM shall provide the following services related to design of <br />the Project. <br />3.8.1 Proiect Conference <br />In accordance with the approved Construction Management <br />Plan and Master Schedule, the CM shall conduct a project <br />conference attended by the Designer, the Owner and others as <br />necessary. During the Project Conference, the CM shall review <br />the Construction Management Plan, the Master Schedule, the <br />Design Phase Milestone Schedule and the Project Guaranteed <br />Maximum Price. The CM shall conduct and prepare minutes of <br />this meeting. <br />3.8.2 Design Phase Information <br />The CM shall monitor the Designer's compliance with the <br />Construction Management Plan and the CM shall coordinate <br />and expedite the flow of information between the Owner, <br />Designer, the CM and others as necessary. <br />3.8.3 Progress Meetings <br />The CM shall participate in regularly scheduled progress <br />meetings attended by the Owner, CM and others as necessary. <br />Such meetings shall serve as a forum for the exchange of <br />information concerning the Project and the review of design <br />progress. The Designer shall prepare and distribute minutes of <br />these meetings to the Owner, CM and others. <br />3.8.4 Review of Design Documents <br />The GM shall review all design documents, including drawings, <br />specifications, addenda, and supplemental design information, <br />for clarity, consistency, constructibility and coordination among <br />the Contractors. The results of the review shall be provided in <br />writing as notations on the documents or in a written report. <br />The GM is not responsible for providing, nor does the GM <br />control, the Project design and contents of the design <br />documents. By performing the reviews described herein, the <br />CM is not acting in a manner so as to assume responsibility or <br />liability, in whole or in part, for all or any part of the Project <br />design and design documents. The CM's actions in reviewing <br />the Project design and design documents and in making <br />recommendations as provided herein are only advisory to the <br />Owner. <br />3.8.5 Design Recommendations <br />The CM shall make recommendations to the Owner and <br />Designer with respect to constructibility, construction cost, <br />sequence of construction, construction duration, possible <br />means and methods of construction, time for construction, and <br />separation of the Project contracts for various categories of <br />Work. In addition, the CM shall give to the Designer all data of <br />which it is aware concerning patents or copyrights for inclusion <br />in Contract Documents. <br />3.8.6 Owner Design Reviews <br />The CM shall compile and convey, in an expedited manner, the <br />Owner's design review comments to the Designer made after <br />the execution of this Agreement. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.