Browse
Search
Agenda - 01-15-2008-4y1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 01-15-2008
>
Agenda - 01-15-2008-4y1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:23:53 PM
Creation date
8/28/2008 9:30:09 AM
Metadata
Fields
Template:
BOCC
Date
1/15/2008
Document Type
Agenda
Agenda Item
4y1
Document Relationships
Minutes - 20080115 - Late
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.11.3 Abnormal inclement weather as defined in Paragraph <br />4.13. <br />4.12 Notice <br />The CM and the Gontractors shall not be entitled to and hereby <br />expressly waive any extension of time resulting from any <br />condition or cause unless a claim for extension of time is made <br />in writing to the Owner by the tenth {10th) day of the month <br />following the month in which the instance of delay is <br />encountered, except excessive inclement weather which shall <br />be made in accordance with paragraph 4.13. All claims not <br />filed in accordance with this Article shall be waived by the CM. <br />Nothing herein shall apply to or be deemed a limitation on the <br />CM's right to seek an adjustment to the Guaranteed Maximum <br />Price for the limited reasons reserved in the Agreement of <br />Intent. Circumstances and activities leading to such claim shall <br />be indicated or referenced in a construction log for the day{s) <br />affected. In every such written claim, the CM shall provide the <br />following information: <br />4.12.1 Nature of the Delay; <br />4.12.2 Date (or Anticipated Date) Of Commencement of Delay: <br />4.12.3 Activities on the Progress Schedule affected by the <br />delay, andlor new activities created by the delay and their <br />relationship with existing activities; <br />4.12.4 Identification of person(s) or organization(s) or events(s) <br />responsible for the delay; <br />4.12.5 Anticipated extent of the delay; and <br />4.12.6 Recommended action to avoid or minimize the delay. <br />4.13 Weather Delays <br />On any day that the CM considers that the Project is delayed <br />by adverse weather conditions, the CM shall identify in writing <br />to the Designer and the Owner the adverse weather conditions <br />affecting each activity, the specific nature of the activity <br />affected, the number of hours lost, and the number of and <br />identity {by responsibility or trade) of workers affected and shall <br />obtain from the Designer written recognition of the delay. <br />The time for performance of this Contract includes an <br />allowance for a number of calendar days which may not be <br />suitable for construction Work by reason of adverse weather. <br />The Contract Time will be extended only if the number of <br />calendar days of adverse weather recognized by the Designer <br />exceeds the number of inclement weather days set forth below, <br />and the CM clearly demonstrates how this adverse weather <br />negatively impacts activities on the critical path of the Master <br />Schedule. <br />Month Number of Inclement Weather Days <br />January 7 <br />February 6 <br />March 7 <br />April 6 <br />May 7 <br />June 6 <br />JUIy 8 <br />August 6 <br />September 5 <br />October 5 <br />November 5 <br />December 9 <br />If the GM believes that the progress of the Work has been <br />adversely affected by adverse weather recognized by the <br />Designer during a particular month, the GM shall submit a <br />written request for extension of time to the Designer. Such a <br />request for time extension of the Contract Time shall be <br />submitted by the tenth (10th) day of the month following that <br />month in which the adverse weather is encountered. The <br />request shall include, but is not limited to, the following <br />information: <br />4.13.1 Detailed description of weather's effect on scheduled <br />activities and its net effect on the critical path of the Project, <br />and <br />4.13.2 Weather records from the official weather station <br />nearest the Project site and records of actual observation as <br />contained in daily reports, correspondence, or other <br />contemporaneously prepared documentation. <br />4.14 Damages for Delay <br />The CM shall not be entitled to any adjustment in the <br />Guaranteed Maximum Price or other compensation from the <br />Owner for any delay in the completion of or progress on the <br />Work unless caused by the sole and direct act or omission of <br />the Owner and the Owner's employees or agents. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.