Browse
Search
Agenda - 01-15-2008-4y1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 01-15-2008
>
Agenda - 01-15-2008-4y1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:23:53 PM
Creation date
8/28/2008 9:30:09 AM
Metadata
Fields
Template:
BOCC
Date
1/15/2008
Document Type
Agenda
Agenda Item
4y1
Document Relationships
Minutes - 20080115 - Late
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
business enterprise goals, the project administrative <br />requirements and technical information. <br />3.9.6 Information to Bidders <br />The CM shall develop and coordinate procedures to provide <br />answers to bidders' questions. <br />3.9.7 Addenda <br />The CM shall receive from the Designer a copy of all addenda. <br />The CM shall review addenda for clarity, consistency and <br />coordination. By pertorming the reviews described herein, the <br />CM is not acting in a manner so as to assume responsibility or <br />liability, in whole or in part, for all or any part of the Project <br />design or the content of the design documents. The CM shall <br />also distribute a copy of all addenda to each bidder receiving <br />documents. <br />3.9.8 Bid Opening <br />The CM shall conduct bid openings in accordance with statute <br />and shall evaluate the bids to determine the lowest responsive <br />and responsible bidder. The CM shall not award or enter into <br />any contract for Work on the Project until the CM has provided <br />the Owner with written notice of the intent to award the contract <br />with reasons for awarding the contract to the successful bidder. <br />This written notice shall also describe compliance by the bidder <br />with the Owner's Minority Business Enterprise Policy, attached <br />to this Agreement as Appendix C. The Owner shall be given <br />reasonable opportunity to consider the qualifications of the <br />successful bidder, and the impact of award of the contract on <br />the Project and Construction Budget. <br />3.9.9 Construction Contracts <br />After obtaining Owner's approval, the GM shall prepare, <br />execute, and deliver the Contract Documents between the CM <br />and the Contractors. The CM shall also issue the notices to <br />proceed. <br />3.9.10 Permits, Insurance and Labor Affidavits <br />The CM shall verify that all required building permits, bonds, <br />insurance, labor affidavits, and waivers required for the Project <br />have been obtained. <br />3.10 Construction Phase <br />The CM shall be responsible for construction administration <br />and management, overall field supervision, Project safety <br />program, quality assurance, and other services needed to <br />construct the Project, using means and methods appropriate <br />for the Project and consistent with the interests of the Owner <br />and the requirements of the Contract Documents. <br />3.10.1 Pre-Construction Conference <br />In connection with the Designer, the CM shall conduct aPre- <br />Construction Conference during which the GM shall review the <br />reporting procedures, site operations and other contractual <br />requirements for the Project. <br />3.10.2 Onsite Management and Construction Phase <br />Communication Procedures <br />The CM shall provide contract administration and establish and <br />implement coordination and communication procedures among <br />the CM, Owner, Designer, and Contractors. <br />3.10.3 Contract Administration Procedures <br />The CM shall establish and implement procedures for <br />expediting and processing requests for information, shop <br />drawings, material and equipment sample submittals, <br />Contractor schedule adjustments, change orders, substitutes, <br />payment requests and the maintenance of logs. The CM shall <br />maintain daily job reports. The CM shall be the party to whom <br />requests for information, submittals, Contractor schedule <br />adjustments, substitutes, change order requests and payment <br />requests shall be submitted by the Contractors. <br />3.10,4 Proiect Site Meetings <br />The CM shall conduct coordination meetings at the site with all <br />Contractors. As set forth in the Master Schedule and the <br />Contract Documents, the CM shall conduct pre-installation and <br />preconstruction meetings for key components of the Work. <br />The CM shall conduct a monthly meeting with the Owner and <br />the Designer to update them on progress of the Work. The GM <br />shall cause to be prepared minutes of all project site meetings <br />and distribute the minutes or cause them to be distributed to all <br />attendees, the Owner and Designer. <br />3.10.5 Coordination of Other Independent Consultants <br />Technical inspection and testing provided by the Designer or <br />others shall be coordinated by the CM. The CM shall be <br />provided with a copy of all inspection and testing reports on the <br />day of the inspection or test or when issued. <br />3.10.6 Contractor's Construction Schedule <br />The CM shall review each Contractor's Construction Schedule <br />and shall verify that the schedule is prepared in accordance <br />with the requirements of the Contract Documents and that it <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.