Orange County NC Website
O <br />Section Iv -Schedule of Deliverables <br />Deliverables shall include: <br />1. Security System Layout that outlines the integrated security systems for the <br />Justice Expansion. <br />2. Construction Documents that include a final set of drawings, request-for- <br />proposal and specifications submitted as a package. <br />3. Documentation of meetings and conversations regarding all aspects of this <br />project. <br />4. Project status reports. <br />5. Punch-list of installation problems and/or vendor problems. <br />6. Statement of installed system condition. <br />7. As-built documentation. R1VIA will review for accuracy the as-built documents <br />for the facilities prior to conveyance to the owner. Following IZMA's review, <br />the contractors will provide as-built documents to Orange County in both paper <br />and electronic formats. <br />.~ <br />w- <br />O <br />d <br />V <br />I <br />O <br />.~ <br />~+ <br />V <br />6 <br />