Orange County NC Website
~O <br />Phase 3 -Construction (23%~ <br />11. Review shop drawings and submittals. <br />12. Conduct four meetings and/or site visits to assist the Project Manager as security <br />project overseer for installation of conduit, wiring, and security system <br />equipment. <br />Phase 4 -Record Documentation /System Acceptance ,10%~ <br />13. Conduct one site visit to inspect and evaluate installed security system <br />equipment, develop a fmal punch-list, and approve system when completed and <br />performing as specified. <br />14. Review and approve as-built documentation: <br />O <br />y-. <br />O <br />V <br />O <br />•s <br />,~,++ <br />^V <br />W <br /> <br />4 <br />~ e <br />Kist; <br />Mun~igemenf: <br />~ssociatcs <br />