Orange County NC Website
<br />Section I -Objectives <br />This proposal will address in a phased approach the Orange County Construction <br />Document development, procurement, construction, and testing of an integrated security <br />system. <br />Risk Management Associates will survey, analyze and design security systems for the <br />Justice Expansion that will include a security management system, digital video system <br />and emergency communications. Our design package will include devices layouts, <br />installation details, low voltage and data riser diagrams as well as detailed system <br />requirements and specifications. <br />Risk Management Associates will handle the project from start to completion. Our <br />objective in this project will be to provide design development and overall project <br />management for an efficient, accurate, and timely project completion. We will verify <br />that the system design is a sound, logical plan that incorporates the newest technology <br />and current security design trends. We will review the project to determine that proper <br />installation techniques are used so that Orange County receives the best system <br />possible. The design will be coordinated to provide proper integration with existing and <br />proposed systems. The completed systems will look and perform as outlined by Orange <br />County. <br /> <br />~~ <br /> <br />'~ <br />O <br />.® <br />V <br />L <br />.~+ <br />A <br />V <br /> <br />2 <br />