Browse
Search
2014-529-E Planning - Terracon Consultants, Inc. for CMT $3,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-529-E Planning - Terracon Consultants, Inc. for CMT $3,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 8:48:30 AM
Creation date
10/13/2014 11:49:47 AM
Metadata
Fields
Template:
BOCC
Date
10/13/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Amount
$3,000.00
Document Relationships
R 2014-529 Planning - Terracon Consultants, Inc. for CMT
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: EA0622FB-3DD4-44A5-954F-65E0383F6927 <br /> rer con <br /> CONSTRUCTION MATERIALS TESTING SERVICES <br /> UNIT RATE FEE SCHEDULE <br /> RALEIGH, N.C. <br /> PERSONNEL/FIELD SERVICES <br /> 1. Field Technician,per hour*........................................................................................... $48.00 <br /> 2. Field Special Inspector,per hour*................................................................................... $68.00 <br /> 3. Asphalt Inspector, per hour*.......................................................................................... $68.00 <br /> 4. Structural Steel Technician, per hour*............................................................................. $85.00 <br /> 5. Certified Welding Inspector,per hour*............................................................................. $95.00 <br /> 6. Ultrasonic Testing, per hour*......................................................................................... $95.00 <br /> 7. Coring Crew,per hour(Includes equipment)..................................................................... $150.00 <br /> 8. Nuclear Density Gauge, per day.................................................................................... $35.00 <br /> 9. Floor Flatness Inspector,per hour*............................................I........11.1.................1...... $68.00 <br /> 10. Floor Flatness and Levelness testing,equipment per day.................................................... $150.00 <br /> 11. Project Engineer, per hour............................................................................................ $125.00 <br /> 12. Project Manager,per hour............................................................................................ $145.00 <br /> 13. Senior Engineer/Associate,per hour............................................................................... $150.00 <br /> 14. Principal, per hour....................................................................................................... $160.00 <br /> 15. Clerical, per hour........................................................................................................ $48.00 <br /> 16. Direct Expenses......................................................................... ... 125% <br /> ............................. <br /> 17. Per Diem,per day....................................................................................................... $155.00 <br /> 18. Trip Charge,per trip.................................................................................................... $60.00 <br /> LABORATORY SERVICES <br /> 1. Percent Fines(Wash 200 sieve), each............................................................................ $75.00 <br /> 2. Sieve Anaylsis,each................................................................................................... $100.00 <br /> 3. Particle Size Analysis(With Hydrometer),each................................................................. $150.00 <br /> 4. Natural Moisture Content Test,each............................................................................... $10.00 <br /> 5. Atterberg Limits Test,each........................................................................................... $95.00 <br /> 6. Standard Proctor Compaction Test,each........................................................................ $160.00 <br /> 7. Standard Proctor Compaction Test(with Rock Correction),each.......................................... $185.00 <br /> 8. Modified Proctor Compaction Test,each......................................................................... $185.00 <br /> 9. Modified Proctor Compaction Test(with Rock Correction),each........................................... $200.00 <br /> 10. CBR Testing, per point................................................................................................ $200.00 <br /> 11. Concrete Compressive Strength Testing of 4 x 8 or 6 x 12 inch Cylinders,each....................... $15.00 <br /> 12. Concrete Compressive Strength Testing of Contractor made 4 x 8 or 6 x 12 inch Cylinders, eact $18.00 <br /> 13. Concrete Flexural Strength Testing of 6 x 6 x18 inch Beams,each....................................... $55.00 <br /> 14. Concrete Compressive Strength Testing of Cores,each..................................................... $55.00 <br /> 15. Masonry Mortar Compressive Strength Testing of 2"x 2"Cubes,each.................................. $14.00 <br /> 16. Masonry Compressive Strength Testing of Grout Prisms,each............................................. $50.00 <br /> 17. Masonry Block Absorption and Compressive Strength, per set of 6....................................... $350.00 <br /> 18. Masonry Block Prism Compressive Strength,each............................................................. $150.00 <br /> 19. Asphalt Core Specific Gravity(thickness and density)Testing,each...................................... $50.00 <br /> 20. Asphalt Maximum Theoretical Specific Gravity(Rice)Testing,each...................................... $225.00 <br /> 21. Asphalt Content(Bum)and Aggregate Gradation,each...................................................... $250.00 <br /> *A minimum of 2 hours will be charged for all field technician time. Increase hourly rate by 1.5 for services provided on <br /> Saturday,in excess of 8 hours per day and/or Monday through Friday before 7:OOA.M.or after 6:00 P.M.Increase hourly rate by <br /> 1.5 for services provided on Sundays or Holidays with a minimum charge of 4 hours. Overtime is not applicable to engineering <br /> rates. Project administration rates are for report review,etc. Hourly charges will be billed portal to portal. Quoted rates will be <br /> effective from January 1,2014 to December 31,2014. <br />
The URL can be used to link to this page
Your browser does not support the video tag.