Browse
Search
Agenda - 10-14-2014 - 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 10-14-2014 - Work Session - Late
>
Agenda - 10-14-2014 - 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 11:29:07 AM
Creation date
10/13/2014 9:05:44 AM
Metadata
Fields
Template:
BOCC
Date
10/14/2014
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes 10-14-2014 Late
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br />Triangle Regional Water Supply Plan — Executive Summary <br />The JLP Recommended Alternative meets the region's cumulative 2060 water supply needs of 294 MGD <br />with 36.4 MGD of new allocations from Jordan Lake, and development of about 63 MGD in water supply <br />from increased and new withdrawals from river sources, increased and new supplemental quarry <br />storage and a new reservoir on the Little River in eastern Wake County. Implementation of the JLP <br />Recommended Alternative would decrease the existing net interbasin transfer from the Neuse River <br />Basin to the Cape Fear River basin. <br />Currently, 63 percent of Jordan Lake's water supply pool has been allocated (a 1 percent storage <br />allocation is estimated to yield approximately 1 MGD of average day supply). The JLP Recommended <br />Alternative includes the same or increased allocations for all existing allocation holders (each is also a <br />member of the JLP), as well as new allocations for several of the Partners. While the JLP is planning for <br />2060, the next round of Jordan Lake allocations (Round 4) will be based on 2045 needs. Table 1 <br />presents current allocations and the total Jordan Lake allocation needs for 2045 (proposed Round 4 <br />allocation requests) and 2060. <br />Table 1. JLP Recommended Alternative Jordan Lake Allocations (MGD). <br />8.5 <br />10.6 <br />11.6 <br />32.0 <br />23.5 <br />28.6 <br />29.8 <br />46.2 <br />3.5 <br />3.5 <br />3.6 <br />3.5 <br />3.5 <br />3.5 <br />6 <br />13 <br />10 <br />16.5 <br />5 <br />5 <br />1 <br />1.5 <br />2 <br />2 <br />0 <br />1 <br />0 <br />6 <br />0 <br />0 <br />0 <br />0 <br />18.2 <br />16.5 <br />5 <br />2 <br />2.2 <br />1 <br />6 <br />0 <br />0 <br />TOTAL JLP 63 91.2 99.4 <br />48.5 <br />Table 2 summarizes additional water supply (62 -64 MGD) from sources other than Jordan Lake in the JLP <br />Recommended Alternative. While most of the sources are expansions of existing water supplies, about <br />41 MGD of the proposed water supply — nearly half of the 95 MGD in new supplies needed to meet <br />regional 2060 demands — will come from a combination of new projects that are planned by the City of <br />Raleigh. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.