Browse
Search
Agenda - 10-14-2014 - 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 10-14-2014 - Work Session - Late
>
Agenda - 10-14-2014 - 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 11:29:07 AM
Creation date
10/13/2014 9:05:44 AM
Metadata
Fields
Template:
BOCC
Date
10/14/2014
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes 10-14-2014 Late
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />Table 1. Proiected Water Suoolv Need IMGDI by Partner. <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.3 <br />1.4 <br />2.1 <br />2.5 <br />2.8 <br />3.1 <br />3.9 <br />5.1 <br />6.3 <br />6.3 <br />6.3 <br />0.0 <br />0.0 <br />0.0 <br />0.1 <br />0.1 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.8 <br />2.3 <br />4.1 <br />5.9 <br />7.0 <br />8.2 <br />10.1 <br />12.1 <br />- 0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.2 <br />2.1 <br />4.0 <br />5.2 <br />6.5 <br />0.4 <br />0.6 <br />0.8 <br />0.9 <br />1.1 <br />0.1 <br />0.6 <br />1.1 <br />1.6 <br />2.1 <br />0.0 <br />0.1 <br />0.5 <br />0.9 <br />1.3 <br />1.8 <br />2.2 <br />2.6 <br />3.0 <br />3.3 <br />3.7 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />- 0.0 <br />0.0 <br />- 0.0 <br />0.0 <br />0.0 <br />1.3 <br />0.0 <br />3.6 <br />0.0 <br />5.8 <br />0.9 <br />0.0 <br />6.9 <br />7.5 <br />1.3 <br />8.1 <br />14.0 <br />3.2 <br />8.4 <br />19.7 <br />5.8 <br />_8.8 <br />25.4 <br />8.4 <br />9.3 <br />31.6 <br />10.6 <br />9.8 <br />37.7 <br />12.8 <br />Total 0.0 <br />0.1 <br />1.8 <br />5.3 <br />11.2 <br />24.7 <br />39.4 <br />54.0 <br />68.4 <br />81.8 <br />95.2 <br />* "Need" assumes that existing Level 1 and Level 11 Jordan Lake allocations are fully utilized <br />Recommended Regional Alternative <br />The JLP evaluated a multitude of regional water supply alternatives that could meet the <br />Region's needs as presented in Table 1. The Triangle Regional Water Supply Plan: Volume 11- <br />Regional Alternatives Analysis presents the methodology and analyses used to create and <br />evaluate those alternatives. A preferred regional alternative for meeting the future needs of all <br />partners through 2060 emerged from this effort and is referred to hereinafter as the "JLP <br />Recommended Alternative." <br />Table 2 presents new water supply sources that would be brought online as part of the JLP <br />Recommended Alternative. The Projected New Supply column lists the estimated yield of <br />supply sources in addition to existing yields currently available. These sources may include <br />either new supply sources or the expansion of existing sources. <br />The City of Raleigh's preferred source options remain uncertain with regard to timing and order <br />of implementation, but include four priority sources, any of which could provide approximately <br />13.7 MGD of additional yield. These include 1) a new Little River Reservoir in eastern Wake <br />County, 2) a reallocation of Falls Lake storage to increase the available water supply pool, 3) a <br />direct withdrawal from the Neuse River upstream of Raleigh's Neuse River Wastewater <br />Treatment Plant, and 4) a quarry reservoir adjacent to the Neuse River near Richland Creek. <br />Under the JLP Recommended Alternative, Raleigh would meet its future demands from a <br />combination of these Neuse Basin sources and would not require a Jordan Lake allocation. <br />Page 1 5 Orange County 2014 Jordan Allocation Request <br />
The URL can be used to link to this page
Your browser does not support the video tag.