Orange County NC Website
Comprehensive Assessment of Emergency Medical Services 129 <br />and 911 /Communications Center Operations Study <br />SECTION 5- PROBABLE COSTS <br />EMERGENCY MEDICAL SERVICES <br />Issue: EMS Base Facilities <br />RECOMMENDATIONS <br />Personnel <br />8 <br />Conduct detailed Space Needs Assessment <br />9 <br />Identify minimum of nine (9) strategic locations <br />10 <br />Purchase identified site and /or building <br />11 <br />Procure base design & construction services <br />12 <br />Construction; nine (9) EMS Bases <br />REC <br />Personnel <br />Equipment <br />Prof. Services <br />Construction <br />Other <br />Total <br />8 <br />n/a <br />n/a <br />$ 12,000 <br />n/a <br />TBD <br />$ 12,000 <br />9 <br />n/a <br />n/a <br />n/a <br />n/a <br />n/a <br />$ - <br />10 <br />n/a <br />n/a <br />n/a <br />n/a <br />TBD <br />TBD <br />11 <br />n/a <br />TBD <br />$1,620,000 <br />n/a <br />TBD <br />$1,620,000 <br />12 <br />n/a <br />TBD <br />n/a <br />$8,064,000 <br />n/a <br />$8,064,000 <br />Notes: <br />Rec 8. Prof. Services- Estimated contracted cost to provide a Space Needs Assessment to address and <br />document building and site requirements for an EMS base facility. <br />Rec 11. Professional Services - Estimated total cost for planning & design services for nine (9) EMS base <br />facilities; assumes design for each facility is contracted for as a single project. <br />Rec 12. Construction- Estimated cost of construction for nine (9) EMS base facilities bid and contracted <br />for as nine (9) separate projects; single facility construction cost based on a current NC County project <br />in final stages of design @ 5,000 square feet x $180 /square foot for pre- engineered steel building. <br />Solutions for Local Government, Inc. 85 <br />