Orange County NC Website
DocuSign Envelope ID: BD2280F8-F51A-494F-9744-35FEOIAD203D <br /> Tandus ( Centiva <br /> A T,,*,Ii Como., <br /> Resilient Flooring Stair Materials Extensive Floor Preparation <br /> Furniture Moving Asbestos Abatement Sales Tax <br /> Carpet Cleaning Cleaning/Waxing of Resilient Border Carpet <br /> TERMS OF PAYMENT: (Subject to Credit Approval) <br /> * All Materials and Labor-Net 30 Days After Each Invoice(Material bills as shipped,labor bills at completion or as phased). <br /> 1.Change Orders:Any work not included in the above scope of work will require a signed change order <br /> before work can be performed. <br /> 2.Term of Quote:Prices given are firm for sixty days from proposal date. <br /> 3.Lead Times:Please note that we are a made to order mill and we cannot begin production of <br /> any order until we have a signed purchase order,or a fully executed contract in house. <br /> Note that normal lead times are as follows: <br /> • Fast Track Carpets,two weeks plus shipping; <br /> • Running Line Carpets,six weeks plus shipping; <br /> • Custom Carpets,eight weeks plus shipping; <br /> • Lead times are approximate and do not start until after the purchase order or fully-executed contract is <br /> received. <br /> 4.Floor Preparation:Additional floor preparation may be required as a result of an unforeseen condition <br /> of the floor.Costs associated with this floor preparation will be negotiated on a job-to job basis.Our product <br /> performs properly when installed on floors that are free of dirt,oil,paint and excessive moisture. <br /> Floors that have moisture readings greater than 3.0 lbs.per 1,000 feet in 24 hours will not meet specification <br /> and wilt require further curing time or treatment prior to carpet installation. <br /> We recommend only wet scraping or mechanical removal of all non-water based adhesives. <br /> 5.Asbestos Abatement:This quote DOES NOT include asbestos abatement.Neither we nor our <br /> installers are responsible for the handling,removal or abatement of asbestos contained floor material or <br /> adhesive.Further,our policy is to request an Asbestos Hazard Emergency Response Act(AHERA)report <br /> prior to proceeding with any floor material or floor adhesive removal.We and our installers consider it the <br /> owner's responsibility to produce this report prior to executing this contract. <br /> If any chemical stripping agents such as those commonly used in asbestos abatement have been used, <br /> we and our installers may require additional measures be taken prior to installation of any product. <br /> These measures may affect the price of this quote.Please contact our Technical Services Department at <br /> 800.248.2878 ext.2129 for more details. <br /> Please indicate your acceptance of this proposal by returning your signed purchase order,or fully-executed <br /> contract via fax to 706.259.2638.Please address it to my attention.Should you have any questions,please <br /> call me at 800.248.2878. <br /> Thank you for choosing us. We look forward to working with you on this project. <br /> Sincerely, <br /> Tandus Centiva US LLC <br /> TOkil <br /> Regional Account Coordinator <br /> Source One <br /> CC: Jennie Griggs <br /> Lisa Ellis <br /> Bill Almeida <br /> TANDUS FLOORING US,LLC. <br /> 1735 CLEVELAND HWY <br /> DALTON,GA 30721 <br /> (P)800.241.4902 <br /> Page 2 of 2 (F)706.259.2638 <br />