Browse
Search
Agenda - 06-03-2008-5b3a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-5b3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:54:36 PM
Creation date
8/28/2008 9:26:17 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
5b3a
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
District II _ C <br />Development of District II will require the extension of the ten inch (10") gravity <br />line from the Gravely Hill pump station to the east side of the property. <br />Sewer easements shall be obtained and this will be a public line. <br />Upgrade to the current GE pump station, north of I 40/85 and off of Industrial <br />Drive, will most likely be required to accept this additional flow. <br />District ~II <br />Development of District III will require the extension of a force main from the <br />intersection of West Ten and Buckhorn Road to the new Regional Pump Station, <br />and require an upgrade to the Gravely Hill Station.. <br />The developer shall absorb costs associated with the improvement of all utility <br />systems in accordance with established County and City of Mebane policies. <br />Additional improvements ~ may be required upon the submission .and review of <br />comprehensive utility management plans by Orange County and the City of Mebane. <br />Utilities shall be stubbed out to adjacent properties. <br /> <br /> <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.