Browse
Search
Agenda - 06-03-2008-5b3a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 06-03-2008
>
Agenda - 06-03-2008-5b3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:54:36 PM
Creation date
8/28/2008 9:26:17 AM
Metadata
Fields
Template:
BOCC
Date
6/3/2008
Document Type
Agenda
Agenda Item
5b3a
Document Relationships
Minutes - 20080603
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART FOUR -UTILITIES AND OTHER PUBLIC SERVICES: <br />SECTION 4-1 UTILITY PLAN: <br />A written, signed agreement between the applicant and the City of Mebane shall be <br />executed, which describes the timing, phasing, design, and financing of public water <br />distribution and public sanitary sewer collection mains for the project, consistent with the <br />following: <br />WATER: <br />District I: <br />The initial needs of the large single retailer are available in the existing <br />infrastructure in Buckhorn Road.. District I will be extension of the twelve inch <br />(12") waterline into the property along the main entry street providing <br />ingress/egress into to District I. <br />At current capacities and pressures of the existing City of Mebane infrastructure <br />domestic and fire flow service shall be available. <br />A private booster pump shall be installed if determined by the City of Mebane and <br />Orange County that it is necessary to provide adequate water pressure to tenants <br />to address fire safety issues. <br />District II and/or IH: <br />The build-out of the other two (2) Districts, regardless of which District is <br />developed first, will require the extension of an additional water lines either from <br />the north side of I 40/85 or from the west along Bowman Road and West Ten <br />Road. <br />As part of the development project, the developer shall submit a detailed Utility <br />Master Plan for review and approval to the City of Mebane and Orange County <br />outlining the appropriate steps that will be taken to provide water service to the <br />remaining Districts prior to the recording of the Class A SUP documents. <br />SEWER: <br />Sewer Collection will be supplied to the BVPD project in a phased format <br />consistent with the District phasing outlined herein. <br />The following sewer improvements have been preliminary identified as being <br />necessary to support the project: <br />District I: <br />District I will be served with a temporary private pump station and force main. <br />The private line will discharge into the existing gravity sewer on the west side of <br />Buckhorn Road. <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.