Orange County NC Website
These entrances shall be reviewed and approved by the Orange County Planning <br />disturbin activities <br />Department pnor to the commencement of earth g , <br />11. The developer shall install sidewallcs along the perimeter of the property allowing for <br />additional pedestrian access to the site, <br />12. The proposed two (2) additional left and right turn. entrances/exits proposed for Buckhorn <br />Road shall be installed but shall not be opened until construction begins on projects <br />within District Two or Three, <br />13. The developer shall construct two (2) proposed bus pullouts at transit stops along <br />Buckhorn Road concurrent with road improvements to Buckhorn Road to include a <br />transit shelter at each stop, <br />14. The developer shall install a transit shelter at the two (2) transit stops (bus pullouts) <br />within the development, <br />15. All traffic directional signage shall be installed at this time as well including, but not <br />limited to: <br />i. Stop signs, <br />ii. Yield signs, <br />iii. Bus parking and unloading informational signs, <br />iv. Lane ends, Merge signs, <br />v. Caution Pedestrian Traffic -Yield Signs, <br />vi. Traffic safety signs designed to direct construction traffic throughout the <br />site, <br />vii. Traffic warning .signs indicating the location of private driveways and <br />forbidding public access to the various properties, <br />viii. Through traffic signs, <br />ix. Any and all signs required by NC DOT for the project <br />SECTION 3-3 ALTERNATIVE TRANSPORTATION: <br />1. The developer shall include bicycle lanes and sidewallcs along both sides, northbound and <br />southbound, of the bridge on Buckhorn Road over I-85. <br />2. The developer shall construct bicycle lanes and sidewalks along roads adjacent to the <br />property boundaries: the northbound lane of Buckhorn Road from West Ten Road to I- <br />85; and the westbound lane of West Ten Road from the eastern edge of property on West <br />Ten Road to Bnclchorn Road. <br /> <br />3. The developer shall construct four (4) bus pullouts and transit shelters at locations <br />indicated for transit stops on the submitted Transportation and Pedestrian Plan. .The <br />developer shall construct the two (2) transit stops and shelters along Buckhorn Road <br />.concurrent with road improvements to Buckhorn Road. <br />32 <br />